Matsing MS-18C45 Instruction Manual

Hide thumbs Also See for MS-18C45:

Advertisement

Quick Links

MS-18C45
Instruction Manual
www.matsing.com
technicalsupport@matsing.com
phone: (800) 867-6429

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MS-18C45 and is the answer not in the manual?

Questions and answers

Summary of Contents for Matsing MS-18C45

  • Page 1 MS-18C45 Instruction Manual www.matsing.com technicalsupport@matsing.com phone: (800) 867-6429...
  • Page 2: Table Of Contents

    Table of Contents 1.00 Pattern diagram 1.10 Horizontal pattern (Beam 1-6, Beam 13-18) 1.20 Horizontal pattern (Beam 7-12) 1.30 Vertical pattern 2.00 Beam & connector 2.10 Plan view resultant beam layout 2.20 Connector port table 2.30 Connector layout 3.00 Transportation & installation 3.10 Transportation (From Point to Point) 3.20...
  • Page 3: Pattern Diagram

    1.00 Pattern diagram 1.10 Horizontal pattern (Beam 1-6, Beam 13-18) Frequency: 3700 - 4200 MHz 1.20 Horizontal pattern (Beam 7-12) Frequency: 3700 - 4200 MHz...
  • Page 4: Vertical Pattern

    1.30 Vertical pattern Frequency: 3700 - 4200 MHz 2.00 Beam & connector 2.10 Plan view resultant beam layout 0˚ 0˚ BEAM 1 - 6 BEAM 13 - 18 BEAM 7 - 12 (Row 1) (Row 3) (Row 2) Plan View Resultant Beam Directions Plan View Resultant Beam Directions Frequency: 37 –...
  • Page 5: Connector Port Table

    Port35 Port 36 Port 33 Port 34 Port 31 Port 32 Port 29 Port 30 Port 27 Port 28 Port 25 Port 26 (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) 2.30 Connector layout MS-18C45 PLAN VIEW CONNECTOR LAYOUT...
  • Page 6: Transportation & Installation Transportation (From Point To Point)

    3.00 Transportation & installation 3.10 Transportation (From Point to Point) Strictly comply with the local authority and regulations on workplace safety and health control and measure when moving and transporting large or heavy equipment; an appropriate material handling machine should be used. (Risk assessment applies for forklift or pallet truck lifting.) 3.20 Bracket mounting...
  • Page 7: Installation Using A Crane

    3.30 Installation using a crane Strictly comply with the local authority and regulations on workplace safety, health control, and measures when performing lifting of large or heavy equipment. An appropriate material handling machine should be used, and only certified personnel should perform the task. (The risk assessment requirement applies for both up-lifting and down-lifting.) 3.31 Lifting the antenna...
  • Page 8: Antenna Installation

    3.40 Antenna installation With reference to the "Bracket Mounting" procedure, the end user is required to custom-make the additional supporting bracket and tighten it to the existing antenna bracket to meet the deployment needs. 3.41 Antenna levelling (After installation) After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...

Table of Contents