Port35 Port 36 Port 33 Port 34 Port 31 Port 32 Port 29 Port 30 Port 27 Port 28 Port 25 Port 26 (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) (+45˚) (-45˚) 2.30 Connector layout MS-18C45 PLAN VIEW CONNECTOR LAYOUT...
3.00 Transportation & installation 3.10 Transportation (From Point to Point) Strictly comply with the local authority and regulations on workplace safety and health control and measure when moving and transporting large or heavy equipment; an appropriate material handling machine should be used. (Risk assessment applies for forklift or pallet truck lifting.) 3.20 Bracket mounting...
3.30 Installation using a crane Strictly comply with the local authority and regulations on workplace safety, health control, and measures when performing lifting of large or heavy equipment. An appropriate material handling machine should be used, and only certified personnel should perform the task. (The risk assessment requirement applies for both up-lifting and down-lifting.) 3.31 Lifting the antenna...
3.40 Antenna installation With reference to the "Bracket Mounting" procedure, the end user is required to custom-make the additional supporting bracket and tighten it to the existing antenna bracket to meet the deployment needs. 3.41 Antenna levelling (After installation) After the Antenna is mounted to the bracket, it is required to be adjusted to 0˚ (Zero Degree) with ≤0.2˚...
Need help?
Do you have a question about the MS-18C45 and is the answer not in the manual?
Questions and answers