Date Prepared by Approved by Document nos Revision 12 Feb 2019 Ray Ling Patrick Yeo MS-12.6-IM-001 INSTRUCTION MANUAL MS-12.6DB180 TABLE OF CONTENTS: 1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam And Connector Layout 1.20 HB and LB Connector 1.30 Connector Ports Table 2.00...
Page 2
1.00 BEAMS & CONNECTORS: 1.10 Plan View Resultant Beam And Connector Layout 1.20 HB and LB Connector Page...
Page 3
1.30 Connector Ports Table 2.00 PATTERN DIAGRAM 2.10 High Band Page...
Page 4
2.20 Low Band 3.00 MANUAL TILT ADJUSTMENT Tilt can be adjusted up to 15° on the antenna for each 20° sector (combination of 2 high band beams, 1 low band beam). For example Beam 1,2 HB and Beam 1 LB can be tilted together (as one sector), Beam 3,4 HB and Beam 2 LB can be tilted together as one sector and so on.
Page 5
Lifting) 4.20 Bracket Mounting Bracket Bolt & Nuts Bolts Set Model Qty (pc) Size (pc) MS-12.6DB180 M14 x 15cm MS-8.4DB120 M12 x 15cm MS-6.3DB90 M12 x 15cm MS-4.2DB60 M12 x 15cm Tighten to the pole with Bolt & Nuts Sets...
Page 6
4.30 Installation using a crane Strictly comply to the Local authority and regulatory on Workplace Safety and Health Control and Measure when performing lifting of large or heavy equipment, appropriate material handling machine should be use and only certified personal should perform the task. (Risk Assessment require to apply for both Up-Lifting and Down-Lifting.) 4.31...