Download Print this page
Crosswater MPRO Industrial PRI120WNC Installation Instructions

Crosswater MPRO Industrial PRI120WNC Installation Instructions

2 hole wall mounted basin

Advertisement

Quick Links

Installation Instructions
First shut off your water heating system then, with your mains stop cock closed,
open the lowest hot and cold taps in the house and allow to run until the cold
storage tank and pipes are empty (the hot water storage cylinder always remains
full).
Fitting isolating valves to the inlet feeds is recommended for ease of maintenance.
Remember to turn off the mains water supply before connecting to any existing pipe
work.
A recess must be made in the wall to accommodate the rough and flexible hoses.
Place the rough in position (between 42 and 58 mm from the face of the tiles to the
back of the rough), check to see if any alterations are needed to the existing pipe
work. Secure the set into the recess in the wall.
Connect the water supply to the tap with hot water on the bottom and cold on the
right. (When viewed from the front).
Place the tiles, while leaving space for the spout.
Fit the spout into the connector of the rough, confirming the spout exit is aligned
downwards vertically. then secure it firmly with set screw.
Slide wall ring over the cartridge cover and secure handle.
ATTENTION
Having first check all new connections, turn on the main stop cock, close all taps
except the monobloc and as system starts to refill check for leaks.
Once you have satisfied yourself that there are no leaks, switch on the water
heating.
Warranty
All Crosswater products come with a limited lifetime warranty. For full details,
terms and conditions please contact Crosswater on:
web-site at www.crosswater.co.uk
The manufacturer reserves the right to make technical modifications without prior
notice.
0345 873 8840 r visit our
o
0182019.0
Installation Instructions
2 Hole Wall Mounted Basin
PRI120WNC/UB

Advertisement

loading
Need help?

Need help?

Do you have a question about the MPRO Industrial PRI120WNC and is the answer not in the manual?

Questions and answers

Summary of Contents for Crosswater MPRO Industrial PRI120WNC

  • Page 1 Once you have satisfied yourself that there are no leaks, switch on the water heating. Warranty All Crosswater products come with a limited lifetime warranty. For full details, Installation Instructions terms and conditions please contact Crosswater on: 0345 873 8840 r visit our web-site at www.crosswater.co.uk...
  • Page 2 Introduction Parts Supplied IMPORTANT: Please read these instructions carefully before you begin and retain for future reference. These instructions have been prepared for your guidance, you ROUGH must exercise due care at all times. SPOUT CONNECTOR We do not accept responsibility for any problems that may occur through incorrect installation.

This manual is also suitable for:

Mpro industrial pri120wnubMpro industrial pri120wnm