Page 1
Clamp-on Industrial Pipe Shelves Instruction Manual SKU: DESK-SHELF16-2N Scan the QR code with your mobile device or follow the link for helpful videos and specifications related to this product. https://vivo-us.com/products/desk-shelf16-2n GET IN TOUCH | Monday-Friday from 7:00am-7:00pm CST help@vivo-us.com www.vivo-us.com...
WARNING! If you do not understand these directions, or if you have any doubts about the safety of the installation, please call a qualified technician. Check carefully to make sure there are no missing or defective parts. Improper installation may cause damage or serious injury. Do not use this product for any purpose that is not explicitly specified in this manual.
ASSEMBLY STEPS STEP 1 Place one Shelf (D) over threaded ends of Middle Pipes (B). Thread Middle Pipes (B) into Top Pipe (A), ensuring that Shelf (D) is in-between Top and Middle Pipes (A, B).
Page 4
STEP 3 Place remaining Shelf (D) over threaded ends on Pipes with Clamp (C). Thread Pipes with Clamps (C) onto Middle Pipes (C). Ensure Shelf (D) is in-between both Pipes (C,D). STEP 4 Loosen knobs on Clamps (C1) until the gap is slightly larger than the mounting surface. NOTE: Desktop thickness range is 10mm to 50mm.
Page 5
STEP 4 - Continued Use 5mm Allen Wrench (T-A) to loosen Clamps (C1) and rotate to the correct position shown in Fig. 2. Rotate the Clamps (C1) to the correct position as shown in Fig. 2 Place Clamps (C1) on the desk and tighten knobs to secure shelf assembly.
INSTALLATION COMPLETE Installation is now complete and your shelf is ready for use. Each shelf can hold 33 lbs/15 kg for a combined 66 lbs/30 kg support.
Page 8
AVG. RESPONSE TIME (within office hrs) - 23% within < 15m - 38% within < 30m - 61% within < 1hr - 83% within < 2hr - 92% within < 3hr FOR MORE VIVO PRODUCTS, CHECK OUT OUR WEBSITE AT: www.vivo-us.com...
Need help?
Do you have a question about the DESK-SHELF16-2N and is the answer not in the manual?
Questions and answers