Connecting The D-Rgb Led Strip; Testing The Loop - EK-Quantum Vector2 EVO Strix-TUF RTX 4080 ABP Set User Manual

Gpu water block
Hide thumbs Also See for Vector2 EVO Strix-TUF RTX 4080 ABP Set:
Table of Contents

Advertisement

CONNECTING THE D-RGB LED STRIP

TESTING THE LOOP

To make sure the installation of EK components was successful, we
recommend you perform a leak test for 24 hours. When your loop
is complete and filled with coolant, connect the pump to a PSU
outside of your system. Do not connect power to any of the other
components. Turn on the PSU and let the pump run continuously.
It is normal for the coolant level to drop during this process as air
collects in the distribution plate. Inspect all parts of the loop, and in
the eventuality, that the coolant leaks, fix the issue and repeat the
testing process. Ensure that all hardware is dry before the system is
powered on in order to prevent any damage.
D-RGB HEADER
RGB HEADER
STEP 1
- 21 -
STEP 1
Plug the 3-pin connector of the distribution plate D-RGB LED
light to the D-RGB HEADER on the motherboard. The LED will
work if the pin layout on the header is as follows: +5V, Digital,
Empty, Ground.
Incorrect installation or installation to a wrong header can
damage the LED strip or the header itself!

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vector2 EVO Strix-TUF RTX 4080 ABP Set and is the answer not in the manual?

Questions and answers

Table of Contents