(3)Installation time: About 2 hours, 2-3 persons needed. Installation time is different according to individual person ( ) (4)Installation instruction: Step 1: Assemble the Part”A”&Part”D”with the Part”H”,”I”,”J”,”K”. Step 2: Assemble the Part”C”&Part”D”with the Part”H”,”I”,”J”,”K”.
Page 3
Step 3: Assemble the Part”B”&Part”D”with the Part”H”,”I”,”J”,”K”. Step 4: Assemble the other side in the same way.
Page 4
Step 5: Install the lights which we provide for you.
Page 6
Step 6: Install the Part”E” into the Roof Rack. Step 4: Step 7: Install the Roof Rack into the car.Note the position of the installation brackets with a making pen.
Page 7
Note the position of the intallation brackets with a marking pen.According to the marks,drill eight installation holes totally with 9mm gun.Then use the pneumatic riveting nut gun with 6mm nut chuck to install the eight riveting nuts.
Page 8
Step 8: The installation is complete.We hope you enjoy a wonderful off road life with this quality product! Attention: 1.The product parts in this instruction may differ slightly from the actual product contents but generally does not affect the installation of the product.
Need help?
Do you have a question about the QP.BXG-804 and is the answer not in the manual?
Questions and answers