Building the Tower
Check this manual is available and its contents familiar to all those involved.
If assembling outdoors; check the forecast windspeed.
The assembled tower is certified to wind forces
equating to 27mph, but handling components under
those conditions would be hazardous.
Also consider the wind funnelling effect of nearby
buildings.
This structure is designed to be self-supporting under the loading condition
requirements of EN 1004-1:2020 and does not require tying in. Consideration
should be given to potential wind conditions if the tower is left unattended.
bossaccesstowers.com
27mph
12m/sec
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Linked Tower with Bridge Platform and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents