Building the Tower
The procedure illustrated shows a 4.2m platform height tower, starting with a 2
rung end frame. Two identical tower based must be assembled.
Push castor into adjustable
1
leg. Push castor/adjustable leg
assemblies into a span frame. Lock
castors. Repeat procedure with a ladder
frame.
It is recommended that for ease of
levelling a gap of 50mm is left between
the bottom of the leg and the adjustable
nut.
Fit one horizontal brace (red) onto
2
the vertical of a span frame as
shown, with the claw facing outwards.
The frame will now be self-supporting.
All locking claws must be opened
before fitting & positively locked after
fitting.
Position the ladder frame as
3
shown and fit the other end of the
horizontal brace on to the vertical.
Fit a second horizontal brace between
the bottom rungs on the other side of the
frames to square the tower.
bossaccesstowers.com
Unlocked
Locked
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Linked Tower with Bridge Platform and is the answer not in the manual?

Questions and answers

Table of Contents