Boss Linked Tower with Bridge Platform Instruction Manual page 22

Mobile aluminium tower 3t - through the trapdoor
Table of Contents

Advertisement

2
Building the Tower
Fit the guardrail frames to the
7
step-through multi-purpose ladder
frames, ensuring all claws are positively
locked and add the sub-assemblies to
the structure. Note: The guardrails must
detach inward.
Fit one ladder frame, one span frame
and four diagonal braces as shown.
Fit the fixed platforms and trapdoor
8
platforms 2m above the previous
levels. Ensure the platform wind-locks
are engaged. Note the orientation of the
trapdoor.
From the protected trapdoor position,
fit guardrails at 0.5m and 1.0m (in that
order) above the platform level.
Fit the final diagonal braces as shown.
20
BoSS Linked Tower
Instruction Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Linked Tower with Bridge Platform and is the answer not in the manual?

Questions and answers

Table of Contents