Dismantling - Boss Linked Tower with Bridge Platform Instruction Manual

Mobile aluminium tower 3t - through the trapdoor
Table of Contents

Advertisement

2
Building the Tower
Fit two 0.3m infill platforms and
11
0.6m infill platforms.
Fit toe board holders and toe boards
around the edges of the top platforms,
as shown.
Temporary guardrails may be stored in
the positions shown.
2.7

Dismantling

To dismantle the tower, reverse the assembly procedure, ensuring that the 3T
method is followed.
When removing the guardrails unlock the four claws furthest from the trapdoor and
return immediately to the protected position within the trapdoor. The other claws can
then be unlocked, and the guardrails removed from the tower.
bossaccesstowers.com
The tower is now complete.
23

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Linked Tower with Bridge Platform and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents