2.2.2 Parts List (SHD-25SL~75SL)............19 2.2.3 Assembly Drawing (SHD-100SL/150SL) ........20 2.2.4 Parts List (SHD-100SL/150SL)............ 21 2.2.5 Assembly Drawing (SHD-12SL/200SL/300SL)......22 2.2.6 Parts List (SHD-12SL/200SL/300SL) .......... 23 2.2.7 Assembly Drawing (SHD-400SL~600SL) ........24 2.2.8 Parts List (SHD-400SL~600SL)........... 25 2.2.9 Assembly Drawing (SHD-800SL/1000SL) ........26 2.2.10...
Page 4
2.3.9 Electrical Components Layout (SHD 400V)(CE) ......47 2.3.10 Bill of Electrical Parts (SHD 400V)(CE) ......... 48 2.3.11 Power, Diameter, Current (SHD-EH 400V) ......60 2.3.12 Main Circuit Diagram(SHD-EH 400V) ........61 2.3.13 Control Circuit Diagram(SHD-EH 400V)........ 62 2.3.14 Electrical Components Layout (SHD-EH 400V) ....63 2.3.15 Bill of Electrical Parts(SHD-EH 400V) ........
Page 5
Table 1-2: Dryer drying capacity(kg/hr)(Selection guide)........14 Table 2-1: Parts list (SHD-25SL~75SL)............19 Table 2-2: Parts list (SHD-100SL/150SL) ............21 Table 2-3: Parts list (SHD-12SL/200SL/300SL)..........23 Table 2-4: Parts list (SHD-400SL~600SL)............25 Table 2-5: Parts list (SHD-800SL/1000SL) ............27 5(125)
Page 6
Table 2-16: Electrical components list (SHD-800SL 400V)(GB)....... 42 Table 2-17: Electrical components list (SHD-1000SL 400V)(GB)..... 43 Table 2-18: Electrical components list (SHD-12SL 400V)(CE) ......48 Table 2-19: Electrical components list (SHD-25SL 400V)(CE) ......49 Table 2-20: Electrical components list (SHD-50SL 400V)(CE) ......50 Table 2-21: Electrical components list (SHD-75SL 400V)(CE) ......
Page 7
Table 2-47: Electrical components list (SHD-800SL 230V)(GB)....... 85 Table 2-48: Electrical components list (SHD-1000SL 230V)(GB)..... 86 Table 2-49: Electrical components list (SHD-12SL 230V)(CE) ......91 Table 2-50: Electrical components list (SHD-25SL 230V)(CE) ......92 Table 2-51: Electrical components list (SHD-50SL 230V)(CE) ......93 Table 2-52: Electrical components list (SHD-75SL 230V)(CE) ......
1. General Description Please read through this operation manual before using the machine to prevent damages of the machine or personal injuries. SHD-50SL 9(125)
1.1 Coding Principle 1.2 Feature Ÿ Adopt hot air diffuser to gain an even hot air flow to improve drying efficiency. Ÿ Hot air inlet elbow design can prevent dust piling up at bottom of the pipe heaters so as to avoid burning. Ÿ...
Page 11
Chapter 5, which contains service instructions intended for service engineers. Other chapters contain instructions for the daily operator. Any modifications of the machine must be approved by SHINI in order to avoid personal injury and damage to machine. We shall not be liable for any damage caused by unauthorized change of the machine.
Page 14
Table 1-2: Dryer drying capacity(kg/hr)(Selection guide) Notes:Based on relative humidity 65% with ambient temperature of 20℃,moisure content after drying can be 0.2% ro less. 14(125)
1.4 Safety Regulations 1.4.1 Safety Signs and Labels Note! Electrical installation should be done by qualified electrician only. Before connecting to AC Power Source, turn power switch to OFF position. While AC power source is connected, make sure specifications and overload protection rating of the power switch are suitable and reliable.
Shini (including employees and agents). Shini is exempted from liability for any costs, fees, claims and losses caused by reasons below: 1. Any careless or man-made installations, operation and maintenances upon machines without referring to the Manual prior to machine using.
2. Structure Characteristics and Working Principle Working Principle Picture 2-1: Working principle In the drying process, hot air with constant temperature is blown by the drying blower 2 of SHD into the drying hopper 7 to dry the materials. Moisture will be separated out and taken away by hot air, thus to gain a satisfied drying effect.
2.2 Drawing and Parts List 2.2.1 Assembly Drawing (SHD-25SL~75SL) Remarks:Please refer to material list 2.2.2 for specific explanation of theArabic numbers in parts drawing. Picture 2-2: Assembly drawing SHD-25SL~75SL 18(125)
2.2.3 Assembly Drawing (SHD-100SL/150SL) Remarks:Please refer to material list 2.2.4 for specific explanation of theArabic numbers in parts drawing. Picture 2-3: Assembly drawing SHD-100SL/150SL 20(125)
2.2.5 Assembly Drawing (SHD-12SL/200SL/300SL) Remarks:Please refer to material list 2.2.6 for specific explanation of theArabic numbers in parts drawing. Picture 2-4: Assembly drawing SHD-12SL/200SL/300SL 22(125)
2.2.7 Assembly Drawing (SHD-400SL~600SL) Remarks:Please refer to material list 2.2.8 for specific explanation of theArabic numbers in parts drawing. Picture 2-5: Assembly drawing SHD-400SL~600SL 24(125)
2.2.9 Assembly Drawing (SHD-800SL/1000SL) Remarks:Please refer to material list 2.2.10 for specific explanation of theArabic numbers in parts drawing. Picture 2-6: Assembly drawing SHD-800SL/1000SL 26(125)
2.2.10 Parts List (SHD-800SL/1000SL) Table 2-5: Parts list (SHD-800SL/1000SL) Part NO. Name SHD-800SL SHD-1000SL Control box** BH31080007850 BH31100007950 Blower* BM30113230050 BM30113230050 Heating case BH70244000750 BH70324000750 Air inlet flange BW21601200010 BW21601200010 Storage hopper BK01080000420 BK01100000420 Cover fastener YR10002500200 YR10002500200 Exhaust pipe BA10020000210 BA10020000210 Down-blow pipe...
Dia. (inch) Effectively filter 80% of dust-contain air discharged from dryer to avoid air pollution. 2.4.2 Air Filter Model Applied to ADC-1 SHD-12SL ADC-2 SHD-25SL~150SL ADC-3 SHD-200SL~1000SL Effectively filter 99% of dust-contain air discharged from dryer to avoid air pollution.
2.4.4 Magnetic Base Magnetic Aluminum Model Applied to Frame Holder× 2 MB-12 SHD-12SL 88.5 × 78 × 2.3 MB-50 SHD-25SL~75SL 118.5 × 105 × 2.3 MR-3 MB-100 SHD-100SL~300SL SHD-400SL and 147 × 130 × 2.3 MB-400 above Made of aluminum with built-in hopper magnet, can effectively separate metal scraps out to avoid material contamination.
2.4.7 Material Suction Box/Shut-off Suction Box European style in appearance design, work with dryer that has a floor stand and vacuum loader, suitable for material suction and discharging. Applied to SHD-12SL~75SL SHD-100SL and above Model -20-38S -160-38S -20-50S -160-50S -20-38D...
2.4.9 Material Tank Equipped with 38mm single-tube suction box,The tank is used to store and convey material toPlaces like hopper loaders to avoid pollution. Dimension (mm) Model Capacity (kg)* H×W × D 985 × 515 × 515 MST-50 1175 × 615 × 615 MST-100 1170 ×...
Picture 3-1: Direct installation Direct installation type is to mount the hopper dryer directly on the molding machine via a standard base. SHD-12SL~300SL is suitable for this mounting method as well as floor stand installation type; SHD-400SL and models above should adopt floor stand installation type.
according to material inlet diameter of the molding machine mounting drill holes. Then use the screw to fasten the base and the molding machine inlet. Floor Stand Installation Picture 3-2: Floor stand installation Floor stand installation type is to mount dryer on a floor stand, then via a photo-sensor hopper receiver to convey the material to the feed port of a molding machine.
randomly exchange two of the three power firing lines and connect them firmly. Picture 3-3: Blower Installation of the Options 3.5.1 Installation of Air-Exhaust Cyclone Dust Collector /Air-Exhaust Filter If the materials contain dust or to avoid the dust-contain air exhausted by dryer polluting the workshop’s environment.
3.5.2 Suction Box Installation Picture 3-5: European suction box When SHD is mounted on the floor stand suction box should be equipped. To convey the dried plastic material conveniently. The installation of suction box is simple. Install them at bottom of the hopper, point to the holes and tighten up the screws. Picture 3-6: Shut-off suction box 3.5.3 Blower Inlet Filter Installation When dryers in the dust-contain environment or hot air requires high cleanliness,...
Installing AIF at blower inlet port when installing it, firstly loosen screws of the blower inlet screen , take down the screen; then install the AIF at blower inlet port, point to the holes and tighten up the screws. 3.5.4 Hot Air Recycler Installation Based on AIF blower inlet filter, using a hear-resistance pipe to connect the hopper exhausting air to AIF.
Operation Guide 4.1 Control Panel Picture 4-1: Control Panel 4.1.1 Panel Operation 1) Turn on main power switch of control box. 2) Press “RUN/STOP” key, it starts drying process, indicator turns green; 3) Press “RUN/STOP” key again, it stops drying process, indicator turns yellow 4.1.2 Temperature Setting 1) The setup number will flicker after pressing "Meun"...
4.1.4 PID Setting 1) Press both “Menu” and “Down” keys for 3 seconds, it shows “P” (proportion) setting; 2) Press “Setup” key, the set value flickers, then press “Up”or “Down” key to add or decrease the value. 3) Press “Setup” key to confirm the input value. 4) Press “Up”...
Parameters Codes Factory Default Proportion Integral time Differential time Over-temp alarm 15℃ Control cycle HCLE Blower delay FDLY ℃ Temp. unit UNIT 4.1.5 Intermittent Operation Setting 1) Hold “Menu” for about 2 secs. to set current time and week. Press “Up” or “Down”...
Page 122
2) Press “Up” key to enter “ID” (communication address) setting; (Notes: The communication address of every controller in the same system must be the only one, no repeat use. In principle: communication address of hopper 1 is 1, communication address of hopper 1 is 2, and so on.) 3) Press “Setup”...
5. Maintenance and Repair 5.1 Blower 1) Clean the blower regularly (especially the air inlet path). 2) Eliminate the fan's dirt regularly to avoid the damage to the blower. Attention! No need for regular inspection because all the electrical parts in the control unit are fixed tightly! 6.
Need help?
Do you have a question about the SHD-12SL and is the answer not in the manual?
Questions and answers