Creative Play PALISADE STILE NUR105 Installation Instructions Manual

Advertisement

NUR105 - PALISADE STILE
Installation Instructions
REF: NUR105 - PALISADE STILE
pg 1 of 6
02/02/2017 - KB

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PALISADE STILE NUR105 and is the answer not in the manual?

Questions and answers

Summary of Contents for Creative Play PALISADE STILE NUR105

  • Page 1 NUR105 - PALISADE STILE Installation Instructions REF: NUR105 - PALISADE STILE pg 1 of 6 02/02/2017 - KB...
  • Page 2: Parts Required

    PARTS REQUIRED 105A [X2] 105B [X2] 105D&C ASSEMBLY 105E&C ASSEMBLY PANEL ASSEMBLY M8X80 SCREWS [X8] TOOLS REQUIRED REF: NUR105 - PALISADE STILE pg 2 of 6 02/02/2017 - KB...
  • Page 3 FOUNDATION DETAIL REF: NUR105 - PALISADE STILE pg 3 of 6 02/02/2017 - KB...
  • Page 4: Installation Instructions

    INSTALLATION INSTRUCTIONS INSTALL 106A AND 106B INTO THE GROUND 105B 105A 105A 105B INSTALL 105D&C ASSEMBLY AND 105E&C ASSEMBLY INTO THE GROUND ENSURE 105E&C ASSEMBLY GOES UNDERNEITH 105D&C ASSEMBLY 105D&C 105E&C REF: NUR105 - PALISADE STILE pg 4 of 6 02/02/2017 - KB...
  • Page 5 INSTALLATION INSTRUCTIONS ATTACH FENCE PANELS TO 105A AND 105B USING M8X80 SCREWS - ENSURE THERE IS A 12MM GAP BETWEEN GROUND LEVEL AND PLAYTEC REF: NUR105 - PALISADE STILE pg 5 of 6 02/02/2017 - KB...
  • Page 6: Additional Dimensions

    ADDITIONAL DIMENSIONS 1510 REF: NUR105 - PALISADE STILE pg 6 of 6 02/02/2017 - KB...

Table of Contents