Greentek Profile 1.2E Series Installation, Operation And Maintenance Manual

Greentek Profile 1.2E Series Installation, Operation And Maintenance Manual

Fresh air appliance

Advertisement

Available languages

Available languages

Quick Links

Installation, Operation, and Maintenance Manual
Manuel d'installation, de fonctionnement et de maintenance
Profile 1.2E (P 1.2E) Series
Fresh Air Appliance (FAA/ERV)
Appareil d'air frais (AAF/VRE)
PARTS IN THE BOX
Energy Recovery Ventilator, 1 pc
Ceiling bracket, 1 pc
Angle brackets, 2 pcs
External Damper Wire harness
(for P 1.2E only), 1 pc
Installation, Operations, and Maintenance
Manual, 1 pc
PIÈCES DANS LA BOÎTE
Ventilateur récupérateur d'énergie, 1 pc
Support muraux, 1 pc
Équerre d'assemblage, 2 pcs
Faisceau de câbles pour volet d'arrêt mécan-
ique externe (P 1.2E seulement), 1 pc
Manuel d'installation, de fonctionnement et de
maintenance, 1 pc
Your ventilation system should be installed in conformance with the appropriate provincial requirements or, in the absence of
such requirements, with the current edition of the National Building Code, and / or ASHRAE's "Good Engineering Practices".
Votre système de ventilation doit être installé conformément aux exigences de la province où vous habitez ou, à défaut de
telles exigences, conformément à l'édition actuelle du Code national du bâtiment du Canada ou aux « méthodes d'ingénierie
appropriées » de l'ASHRAE.
Canada
50 Kanalflakt Way, Bouctouche, NB, E4S 3M5
Tel.: 800.565.3548 • Fax: 877.747.8116
Greentek reserves the right to modify, at any time and without notice, any or all of its products' features,
designs, components and specifications to maintain their technological leadership position.
Please visit our website www.Greentek.ca for more detailed technical information.
Greentek se réserve le droit de modifier partiellement ou entièrement, en tout moment et sans préavis, les
caractéristiques, la conception, les composants et les spécifications de ses produits, afin de conserver sa
position de leader de technologie.
S'il vous plaît visitez notre site siteweb www.Greentek.ca pour des informations techiques plus détaillées.
Model: P 1.2E
Model: P 1.2E-D
Literature Item #: 464045
Rev Date: 2024-06-14
No. d'article de la littérature : 464045
Date de révision : 2024-06-14
For P
1.2E-D-
EC only
Model: P 1.2E-D-EC

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Profile 1.2E Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Greentek Profile 1.2E Series

  • Page 1 50 Kanalflakt Way, Bouctouche, NB, E4S 3M5 Tel.: 800.565.3548 • Fax: 877.747.8116 Greentek reserves the right to modify, at any time and without notice, any or all of its products’ features, designs, components and specifications to maintain their technological leadership position.
  • Page 2 Note Warning/ Information Technical Practical tip Important information note This product earned the ENERGY STAR® by meeting strict energy efficiency guidelines set by Natural Resources Canada and the US EPA. This product meets ENERGY STAR requirements only when used in Canada. To ensure quiet operation of the ENERGY STAR certified ERV, each product model must be installed using sound attenua- tion techniques appropriate for the installation.
  • Page 3: Table Of Contents

    TABLE OF CONTENTS DETERMINING YOUR AIRFLOW REQUIREMENT ........... . . 4 INSTALLATION EXAMPLES Fully dedicated system .
  • Page 4: Determining Your Airflow Requirement

    DETERMINING YOUR AIRFLOW REQUIREMENT Room Count Method Room classification Number of rooms CFM (L/s) CFM Required Master bedroom x 10 L/s (20 CFM) if yes add 10 L/s (20 CFM) Basement yes or no if no = 0 Bedrooms x 5 L/s (10 CFM) Living room x 5 L/s (10 CFM) Others...
  • Page 5: Installation Examples

    INSTALLATION EXAMPLES Suggested installation for: • Hydronic baseboard FULLY DEDICATED SYSTEM • Infloor heating BEST FOR NEW CONSTRUCTION • Electric baseboard Stale air is drawn from key areas of • Mini split heat pump home (bathroom, kitchen, laundry) Fresh air supplied to main living areas Benefits: Provides the best fresh air distribution in the house;...
  • Page 6: Partially Dedicated System

    The ERV should only be paired with one forced air system. In the case Benefits: Conditions the where there are more than one forced air system please contact Greentek fresh air prior to customer service prior to making a product selection.
  • Page 7: Simplified Installation

    Installation examples (Cont'd) Suggested installation for: • When bathroom and DIRECT CONNECTION of both the ERV SUPPLY AIR STREAM and EXHAUST AIR STREAM to the FORCED AIR SYSTEM COLD AIR RETURN kitchen already have local exhaust system SIMPLIFIED INSTALLATION (GOOD) •...
  • Page 8: Exterior Ducting Installation

    EXTERIOR DUCTING INSTALLATION WEATHERHOOD LOCATION OUTSIDE CORNER INSIDE CORNER • Decide where your intake and exhaust hoods will be located. 36" (1m) 36” (1m) min. min. Locating the Intake Weatherhood • Should be located upstream (if there are prevailing winds) from the 6' (2m) exhaust outlet.
  • Page 9: Interior Ducting Installation

    Interior ducting installation • To maximize airflow through the ductwork system, all ducts should be kept short and have as few bends or elbows as possible. • 45º elbows are preferable to 90º. • Use “Y“ ducts instead of “T” ducts whenever possible. •...
  • Page 10: Erv Installation

    ERV installation LOCATION The ERV must be located in a conditioned space where it will be possible to conveniently service the unit. Typically the ERV would be located in the mechanical room or an area close to the outside wall where the weatherhoods will be mounted.
  • Page 11: Ceiling Mounting

    Mounting CEILING INSTALLATION 1 Using the screw with washer mount the mounting bracket through the 2 Using the screw with washer mount the brackets at the bottom of the rubber insulator. Ensure the bracket is straight. unit. 3 Slide the unit the bracket as shown above. 4 Secure both side of the unit using the same method as step 1.
  • Page 12: Wall Mounting

    Mounting WALL INSTALLATION 1 Using the screw with washer mount the mounting bracket through the 2 Using the screw with washer mount the brackets at the bottom of the rubber insulator. Ensure the bracket is straight. unit. 3 Slide the unit in the bracket and secure with setting screw.
  • Page 13: Airflow Adjustment & Balancing

    Airflow balancing Balancing must be completed using the Greentek Programmable Touch Screen Wall Control ENTERING BALANCING MODE In the options menu during the initial 5 second countdown sequence, long press on "ECO" area for 5 seconds to enter basic balancing mode. The supply and exhaust...
  • Page 14: Wall Controls

    WALL CONTROLS * Please see instruction manuals for individual controls for proper wiring and set up of control systems. Ensure that unit is not plugged when connecting the control. The wiring connectors can be removed for easier connection. CENTRAL CONTROLS These cannot be used with another central control (+ →...
  • Page 15 WALL CONTROLS (CONT'D) AUXILIARY CONTROL –These controls can be paired with central controls or combined together. (+ → + ; - → -) *Maintain polarity between control and ERV T SERIES FEATURES CONNECTS TO • 20/40/60 minute timer with three LED light •...
  • Page 16: Wiring Diagram

    Wiring diagram - P 1.2E & P 1.2E-D Observe polarity on all accessory controls where applicable.
  • Page 17 Wiring diagram - P 1.2E-D-EC Observe polarity on all accessory controls where applicable.
  • Page 18 Wiring diagram (CONT'D) WIRING DIAGRAM TO Standard Accessory Control Contact Standard Furnace Interlock Wiring FORCED AIR SYSTEM THERMOSTAT TERMINALS FOUR WIRE TWO WIRE heating only FOR A FURNACE CONNECTION TO A COOLING SYSTEM: On some newer furnaces and older FURNACE/HEATING FURNACE thermostats, energizing the R and 24-VOLT...
  • Page 19: Control Hierarchy / Operations

    CONTROL HIERARCHY / OPERATIONS Terminal Block Label Description Remote off function (dry contact) – When S+ and S- terminals are shorted together, the ventilation product will be forced into standby mode until the dry contact is opened. Digital communication lines for four-wire controllers. ↓...
  • Page 20: Troubleshooting

    Troubleshooting Problem Causes Solutions Air is too dry Dehumidistat control is set too low Increase the desired level of humidity. Change ventilation mode from continuous mode to standby. ERV out of balance Have contractor balance ERV airflows Air is too humid Dehumidistat control is set too high Reduce the desired level of humidity.
  • Page 21: Erv Core Washing Instructions

    Filters and ERV core washing instructions For proper maintenance of your energy recovery core please follow these instructions To remove the door, loosen both latches on the bottom of the unit. Rotate the metal plate holding the ERV core in place. Remove both filters.
  • Page 22: Erv Maintenance Chart

    Lines beginning of the warranty period. Vacuum the Inside of the Annually • The fans found in all Greentek ERVs Unit require no lubrication, and are factory balanced to prevent vibration and Clean and Un-block Annually promote silent operation.
  • Page 23 50 Kanalflakt Way, Bouctouche, NB, E4S 3M5 Tél.: 800.565.3548 • Fax: 877.747.8116 Greentek se réserve le droit de modifier partiellement ou entièrement, en tout moment et sans préavis, les caractéristiques, la conception, les composants et les spécifications de ses produits, afin de conserver sa position de leader de technologie.
  • Page 24 Note Avertissement/ Information Information Conseil Note importante technique pratique Ce produit a obtenu la certification ENERGY STAR® en respectant les directives strictes d'efficacité énergétique établies par Ressources naturelles Canada et l'EPA des ÉtatsUnis. Ce produit répond aux exigences ENERGY STAR uniquement lorsqu'il est utilisé...
  • Page 25 TABLE DES MATIÈRES DÉTERMINER VOS BESOINS DE VENTILATION ........... . . 26 EXEMPLES D'INSTALLATION Système entièrement spécialisé...
  • Page 26: Déterminer Vos Besoins De Ventilation

    DÉTERMINER VOS BESOINS DE VENTILATION Méthode compte de pièces Pi 3 /min (L/s) Liste des pièces Nombre de pièces PCM Required x 10 L/s (20 pi 3 /min) Chambre principale 3 /min Si oui, ajoutez 10 L/s (20 pi Sous-sol oui ou no Sinon = 0 x 5 L/s (10 pi 3 /min)
  • Page 27: Exemples D'installation

    EXEMPLES D'INSTALLATION Exemple seulement - La configuration des conduits peut être différente selon le modèle. Installation suggéré pour: • Plinthe à eau chaude • Chauffage de planché • Plinthe électriques • Thermopompe mural bibloc SYSTÈME ENTIÈREMENT SPÉCIALISÉ Avantages: Fourni la meilleure (NOUVELLE CONSTRUCTION) répartition de l’air frais dans la maison;...
  • Page 28: Système Partiellement Spécialisé

    à l'extérieur air pulsé Pour les ventilateurs récupérateurs d'énergie (VRE) de Greentek qui ne comprennent pas un volet motorisé pour l'air extérieur : Si vous utilisez une installation partiellement spécialisée ou simplifiée, où le conduit d'alimentation d'air du VRE est relié au conduit de retour d'un système à...
  • Page 29: Installation Simplifiée

    Retour d'air frais Pour les ventilateurs récupérateurs d'énergie (VRE) de Greentek qui ne comprennent pas un volet motorisé pour l'air extérieur : Si vous utilisez une installation partiellement spécialisée ou simplifiée, où le conduit d'alimentation d'air du VRE est relié au conduit de retour d'un système à...
  • Page 30: Installation Des Conduits Extérieurs

    INSTALLATION DES CONDUITS EXTÉRIEURS EMPLACEMENT DES HOTTES Coin extéreur Coin intérieur OUTSIDE CORNER INSIDE CORNER • Décidez de l’emplacement des hottes d’aspiration et d’évacuation. 36po (1m) 36po (1m) 36" (1m) 36” (1m) min. min. Emplacement de la hotte d’aspiration • Doit être située en amont de la sortie d’évacuation (en présence de vents 3pi (900 mm) dominants).
  • Page 31: Installation Des Conduits Intérieurs

    INSTALLATION DES CONDUITS INTÉRIEURS • Pour maximiser le débit d’air dans le réseau de conduits, assurez-vous que tous les conduits sont le plus court et le plus droit possible. • Il est préférable d’utiliser des coudes de 45 degrés plutôt que des coudes de 90 degrés. •...
  • Page 32: Installation Du Vre

    INSTALLATION DU VRE EMPLACEMENT Le VRE doit être situé dans un endroit chauffé où il sera possible d’en effectuer l'entretient convenablement. Généralement, le VRE doit être situé dans la chambre des appareils mécaniques ou à proximité. S’il n’y a pas de sous-sol ou si le sous-sol ne convient pas, il est possible d’installer l’appareil dans la lingerie ou dans la buanderie.
  • Page 33: Installation Au Plafond

    MONTAGE INSTALLATION AU PLAFOND 1 À l'aide de la vis avec rondelle, montez le support de montage à 2 À l'aide de la vis avec rondelle, montez les supports au bas de l'unité. travers l'isolant en caoutchouc. Assurez-vous que le support est droit. 3 Faites glisser l'unité...
  • Page 34: Installation Murale

    MONTAGE INSTALLATION MURALE 1 À l'aide de la vis avec rondelle, montez le support de montage à 2 À l'aide de la vis avec rondelle, montez les supports au bas de l'unité. travers l'isolant en caoutchouc. Assurez-vous que le support est droit. 3 Faites glisser l'unité...
  • Page 35: Préparation Générale

    ÉQUILIBRAGE L’équilibrage doit être réalisé à l’aide de la commande murale à écran tactile programmable Greentek. Ajustement des débits d'air ACCÉDER AU MODE D’ÉQUILIBRAGE Dans le menu d’options, lors de la séquence de décompte initiale de 5 secondes, appuyez sur la zone « ECO » pendant 5 secondes pour accéder au mode d’équilibrage de base.
  • Page 36: Commandes Murales

    COMMANDES MURALES * Veuillez consulter les manuels d’instructions des dispositifs de commande individuels pour connaître la bonne configuration de câblage et l’installation adéquate des systèmes de commande. Assurez-vous que l’appareil n’est pas branché lorsque vous reliez la commande. Les raccords de câblage peuvent être retirés pour faciliter le branchement. COMMANDES CENTRALES Ceux-ci ne peuvent pas être utilisés avec une autre commande centrale (+ →...
  • Page 37 COMMANDES MURALES (SUITE) COMMANDE AUXILIAIRE – Ces commandes peuvent être associées à des commandes centrales ou combinées ensemble. (+ → + ; - → -) *Conserver la polarité entre la commande et le VRE SÉRIE T CARACTÉRISTIQUES RELIER À • Minuterie de 20/40/60 minutes avec trois voyant à DEL. •...
  • Page 38 Schémas électroniques - P 1.2E & P 1.2E-D Respectez la polarité sur tous les accessoires de contrôles. Le cas échéant.
  • Page 39 Schémas électroniques - P 1.2E-D-EC Respectez la polarité sur tous les accessoires de contrôles. Le cas échéant.
  • Page 40: Schémas Électriques

    Schémas électroniques (SUITE) CONNEXION ÉLECTRIQUE Bornes pour Accessoire de Contrôle Standard Standard Furnace Interlock Wiring À UN SYSTÈME À AIR BORNES DU PULSÉ THERMOSTAT TERMINALS TERMINALS FOUR QUATRE FILS WIRE DEUX FILS TWO WIRE chauffage seulement heating only DANS LE CAS D'UNE FOURNAISE RACCORDÉE À...
  • Page 41: Hiérarchie / Opérations De Contrôle

    HIÉRARCHIE / OPÉRATIONS DE CONTRÔLE Étiquette de bornier Description Fonction d'arrêt à distance (contact sec) – lorsque les bornes S+ et S- sont court-circuitées, le produit de venti- lation est forcé en mode veille jusqu'à ce que le contact sec soit ouvert. Lignes de communication numériques pour contrôleurs à...
  • Page 42: Dépannage

    Dépannage Problème Causes Solutions L’air est trop sec – Le déshumidistat est réglé trop bas – Augmentez le niveau voulu d’humidité. Faites passer le mode de ventilation de « continu » à « attente ». – Le VRE est déséquilibré –...
  • Page 43: Instruction De Nettoyage Du Noyau Récupérateur D'énergie

    Instructions de nettoyage des filtres et du noyau récupérateur d'énergie Pour un bon entretien de vos filtres et de votre noyau de récupération d'énergie suivez ces instructions Pour retirer la porte, desserrez les deux loquets situés à la partie inférieure de la centrale Faites pivoter...
  • Page 44: Tableau D'entretien Du Vre

    * L'horaire peut être modifiée au besoin. Un entretien plus fréquent pourrait être nécessaire selon la sévérité des environnements • Greentek se réserve le droit de fournir internes et externes de votre maison. des pièces remises à neuf comme pièces de rechange.
  • Page 45: Spare Parts List

    SERVICE MANUAL - P 1.2E SERVICE MANUEL - P 1.2E Description P 1.2E P 1.2E-D P 1.2E-D-EC BOM # La description (464401) (464403) (464404) Motor 448002 448002 448003 Electrostatic Filters 448004 448004 448004 Energy Recovery Cell 448005 448005 448005 Capacitors 450038 450038 PC board...
  • Page 46 NOTES...
  • Page 47 NOTES...
  • Page 48 Greentek reserves the right to make technical changes. Greentek se réserve le droit de faire des changements tech- For updated documentation please refer to www.Greentek.ca niques. Pour de la documentation à jour, s'il vous plaît se référer au www.Greentek.ca Greentek®...

This manual is also suitable for:

P 1.2e seriesP 1.2e-dP 1.2e-d-ec

Table of Contents