Greentek Profile 0.7E Installation And Operation Manual

Greentek Profile 0.7E Installation And Operation Manual

Fresh air appliance (faa/erv)

Advertisement

Available languages

Available languages

Quick Links

Manuel d'installation et d'utilisation
Profile 0.7E (P 0.7E)
Fresh Air Appliance (FAA/ERV)
Appareil à air frais (AAF/VRE)
PARTS IN THE BOX
Energy Recovery Ventilator, 1 pc
Ceiling bracket, 1 pc
Angle brackets, 2 pcs
External Damper Wire harness, 1 pc
Operation and Installation Manual, 1 pc
PIÈCES DANS LA BOÎTE
Ventilateur récupérateur d'énergie, 1 pc
Support muraux, 1 pc
Équerre d'assemblage, 2 pcs
Faisceau de câbles de clapet externe, 1 pc
Manuel d'installation, 1 pc
Your ventilation system should be installed in conformance with the appropriate provincial requirements or, in the absence of
such requirements, with the current edition of the National Building Code, and / or ASHRAE's "Good Engineering Practices".
Votre système de ventilation doit être installé conformément aux exigences de la province où vous habitez ou, à défaut de
telles exigences, conformément à l'édition actuelle du Code national du bâtiment du Canada ou aux « méthodes d'ingénierie
appropriées » de l'ASHRAE.
50 Kanalflakt Way, Bouctouche, NB, E4S 3M5
Tel.: 888.724.5211 • email info@greentek.ca
Greentek reserves the right to modify, at any time and without notice, any or all of its products' features,
designs, components and specifications to maintain their technological leadership position.
Please visit our website www.greentek.ca for more detailed technical information.
Greentek se réserve le droit de modifier partiellement ou entièrement, en tout moment et sans préavis, les
caractéristiques, la conception, les composants et les spécifications de ses produits, afin de conserver sa
position de leader de technologie.
S'il vous plaît visitez notre site siteweb www.greentek.ca pour des informations techiques plus détaillées.
Installation and Operation Manual
Literature Item #: 445794
Rev Date: 2024-06-14
Numéro d'article de la littérature : 445794
Date de révision : 2024-06-14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Profile 0.7E and is the answer not in the manual?

Questions and answers

Summary of Contents for Greentek Profile 0.7E

  • Page 1 50 Kanalflakt Way, Bouctouche, NB, E4S 3M5 Tel.: 888.724.5211 • email info@greentek.ca Greentek reserves the right to modify, at any time and without notice, any or all of its products’ features, designs, components and specifications to maintain their technological leadership position.
  • Page 2 Note Warning/ Information Technical Practical tip Important information note PLEASE READ AND SAVE THESE INSTRUCTIONS For residential use only Before installation careful consideration must be given to how this system will operate if connected to any other piece of mechanical equipment, i.e. a forced air furnace or air handler operating at a higher static pressure.
  • Page 3: Table Of Contents

    TABLE OF CONTENTS DETERMINING YOUR AIRFLOW REQUIREMENT ........... . . 4 INSTALLATION EXAMPLES Fully dedicated system .
  • Page 4: Determining Your Airflow Requirement

    DETERMINING YOUR AIRFLOW REQUIREMENT Room Count Method Room classification Number of rooms CFM (L/s) CFM Required Master bedroom x 10 L/s (20 CFM) if yes add 10 L/s (20 CFM) Basement yes or no if no = 0 Bedrooms x 5 L/s (10 CFM) Living room x 5 L/s (10 CFM) Others...
  • Page 5: Installation Examples

    INSTALLATION EXAMPLES Suggested installation for: • Hydronic baseboard • Infloor heating • Electric baseboard • Mini split heat pump FULLY DEDICATED SYSTEM Benefits: Provides the best BEST FOR NEW CONSTRUCTION fresh air distribution in the Stale air is drawn from key areas of home (bathroom, kitchen, laundry) house;...
  • Page 6: Partially Dedicated System

    SYSTEM outside For Greentek products that do not include an outdoor air motorized damper: If you are using a partially dedicated or simplified installation, i.e. connecting the product's supply air duct to a forced air system's return air duct, the product must operate continuously. When the product is turned off, no warm exhaust air will flow through the product but the forced air system's blower will continue to draw in outdoor air through the product.
  • Page 7: Simplified Installation

    SYSTEM For Greentek products that do not include an outdoor air motorized damper: If you are using a partially dedicated or simplified installation, i.e. connecting the product's supply air duct to a forced air system's return air duct, the product must operate continuously. When the product is turned off, no warm exhaust air will flow through the product but the forced air system's blower will continue to draw in outdoor air through the product.
  • Page 8: Exterior Ducting Installation

    EXTERIOR DUCTING INSTALLATION WEATHERHOOD LOCATION OUTSIDE CORNER INSIDE CORNER • Decide where your intake and exhaust hoods will be located. 36" (1m) 36” (1m) min. min. Locating the Intake Weatherhood • Should be located upstream (if there are prevailing winds) from the 6' (2m) exhaust outlet.
  • Page 9: Interior Ducting Installation

    INTERIOR DUCTING INSTALLATION • Ducts should be kept short and have as few bends or elbows as possible. • 45º elbows are preferable to 90º. • Use “Y“ ducts instead of “T” ducts whenever possible. • All duct joints must be fastened with screws or duct sealant and wrapped with aluminum foil duct tape to prevent leakage. •...
  • Page 10: Erv Installation

    ERV INSTALLATION LOCATION The ERV must be located in a conditioned space where it will be possible to conveniently service the unit. Typically the ERV would be located in the mechanical room or an area close to the outside wall where the weatherhoods will be mounted.
  • Page 11: Ceiling Mounting

    MOUNTING CEILING INSTALLATION 1 Using the screw with washer mount the mounting bracket through the 2 Using the screw with washer mount the brackets at the bottom of the rubber insulator. Ensure the bracket is straight. unit. 3 Slide the unit the bracket as shown above. 4 Secure both side of the unit using the same method as step 1.
  • Page 12: Wall Mounting

    MOUNTING WALL INSTALLATION 1 Using the screw with washer mount the mounting bracket through the 2 Using the screw with washer mount the brackets at the bottom of the rubber insulator. Ensure the bracket is straight. unit. 3 Slide the unit in the bracket and secure with setting screw.
  • Page 13: Airflow Adjustment & Balancing

    AIRFLOW ADJUSTMENT & BALANCING BALANCING THE AIRFLOWS IS CRUCIAL TO ENSURE OPTIMAL OPERATION OF THE UNIT. IF THE AIRFLOW IS NOT PROPERLY BALANCED, THE FOLLOWING ISSUES MAY OCCUR: • SIGNIFICANT POSITIVE OR NEGATIVE PRESSURE INSIDE THE HOUSE • UNIT’S EFFICIENCY MAY BE NEGATIVELY AFFECTED •...
  • Page 14: Balancing Steps

    Measuring the airflow using station (grid) method 1 Cut hole in duct and insert flow measuring 2 Before taking the reading, make sure that 3 Adjust the “Supply Air Out” damper until station. Make sure that the flow measuring the magnehelic gauge is level and at 0. you reach the desired velocity.
  • Page 15: Wall Controls

    WALL CONTROLS * Please see instruction manuals for individual controls for proper wiring and set up of control systems. Ensure that unit is not plugged when connecting the control. The wiring connectors can be removed for easier connection. CENTRAL CONTROLS These cannot be used with another central control (+ →...
  • Page 16 WALL CONTROLS (CONT'D) AUXILIARY CONTROL –These controls can be paired with central controls or combined together. (+ → + ; - → -) *Maintain polarity between control and ERV T SERIES FEATURES CONNECTS TO • 20/40/60 minute timer with three LED light •...
  • Page 17: Wiring Diagram

    WIRING DIAGRAM...
  • Page 18 WIRING DIAGRAM (CONT'D) WIRING DIAGRAM TO Standard Accessory Control Contact Standard Furnace Interlock Wiring FORCED AIR SYSTEM THERMOSTAT TERMINALS FOUR WIRE TWO WIRE heating only FOR A FURNACE CONNECTION TO A COOLING SYSTEM: On some newer furnaces and older FURNACE/HEATING FURNACE thermostats, energizing the R and 24-VOLT...
  • Page 19: Control Hierarchy / Operations

    CONTROL HIERARCHY / OPERATIONS Terminal Block Label Description Remote off function (dry contact) – When S+ and S- terminals are shorted together, the ventilation product will be forced into standby mode until the dry contact is opened. Digital communication lines for four-wire controllers. ↓...
  • Page 20: Troubleshooting

    TROUBLESHOOTING Problem Causes Solutions Air is too dry Dehumidistat control is set too low Increase the desired level of humidity. Change ventilation mode from continuous mode to standby. ERV out of balance Have contractor balance ERV airflows Air is too humid Dehumidistat control is set too high Reduce the desired level of humidity.
  • Page 21: Erv Core Washing Instructions

    FILTERS AND ERV CORE WASHING INSTRUCTIONS For proper maintenance of your energy recovery core please follow these instructions To remove the door, remove locking screw and washer on the side of the unit. Remove both filters.Wash filters in warm soapy water then rinse and let dry. Rotate the metal plate holding the ERV core in place.
  • Page 22: Erv Maintenance Chart

    Lines beginning of the warranty period. Vacuum the Inside of the Annually • The fans found in all Greentek ERVs Unit require no lubrication, and are factory balanced to prevent vibration and Clean and Un-block Annually promote silent operation.
  • Page 23 50 Kanalflakt Way, Bouctouche, NB, E4S 3M5 Tel.: 888.724.5211 • email info@greentek.ca Greentek se réserve le droit de modifier partiellement ou entièrement, en tout moment et sans préavis, les caractéristiques, la conception, les composants et les spécifications de ses produits, afin de conserver sa position de leader de technologie.
  • Page 24 Note Avertissement/ Information Information Conseil Note importante technique pratique VEUILLEZ LIRE ET CONSERVER CES INSTRUCTION À fin d’installation résidentielle seulement Avant de procéder à l’installation, examinez avec soin la façon dont le système fonctionnera s’il est relié à tout autre appareil mécanique, notamment une fournaise à air pulsé ou un appareil de traitement d’air dont la pression statique est plus élevée.
  • Page 25 TABLE DES MATIÈRES DÉTERMINER VOS BESOINS DE VENTILATION ........... . . 26 EXEMPLES D'INSTALLATION Système entièrement spécialisé...
  • Page 26: Déterminer Vos Besoins De Ventilation

    DÉTERMINER VOS BESOINS DE VENTILATION Méthode compte de pièces Pi 3 /min (L/s) Liste des pièces Nombre de pièces PCM Required x 10 L/s (20 pi 3 /min) Chambre principale 3 /min Si oui, ajoutez 10 L/s (20 pi Sous-sol oui ou no Sinon = 0 x 5 L/s (10 pi 3 /min)
  • Page 27: Exemples D'installation

    EXEMPLES D'INSTALLATION Installation suggéré pour: Exemple seulement - La configuration des conduits peut être différente selon le modèle. • Plinthe à eau chaude • Chauffage de planché • Plinthe électriques • Thermopompe mural bibloc Avantages: Fourni la meilleure SYSTÈME ENTIÈREMENT SPÉCIALISÉ répartition de l’air frais dans (NOUVELLE CONSTRUCTION) la maison;...
  • Page 28: Système Partiellement Spécialisé

    Pour les produits Greentek ne comportant pas de volet motorisé d'air extérieur : Si vous utilisez une installation partiellement dédiée ou simplifiée, c'est-à-dire en reliant le conduit d'air soufflé du produit au conduit d'air de reprise d'un système à air pulsé, le produit doit fonctionner en continu.
  • Page 29: Installation Simplifiée

    à l'extérieur air pulsé Pour les produits Greentek ne comportant pas de volet motorisé d'air extérieur : Si vous utilisez une installation partiellement dédiée ou simplifiée, c'est-à-dire en reliant le conduit d'air soufflé du produit au conduit d'air de reprise d'un système à air pulsé, le produit doit fonctionner en continu.
  • Page 30: Installation Des Conduits Extérieurs

    INSTALLATION DES CONDUITS EXTÉRIEURS EMPLACEMENT DES HOTTES Coin extéreur Coin intérieur OUTSIDE CORNER INSIDE CORNER • Décidez de l’emplacement des hottes d’aspiration et d’évacuation. 36po (1m) 36po (1m) 36" (1m) 36” (1m) min. min. Emplacement de la hotte d’aspiration • Doit être située en amont de la sortie d’évacuation (en présence de vents 3pi (900 mm) dominants).
  • Page 31: Installation Des Conduits Intérieurs

    INSTALLATION DES CONDUITS INTÉRIEURS • Pour maximiser le débit d’air dans le réseau de conduits, assurez-vous que tous les conduits sont le plus court et le plus droit possible. • Il est préférable d’utiliser des coudes de 45 degrés plutôt que des coudes de 90 degrés. •...
  • Page 32: Installation Du Vre

    INSTALLATION DU VRE EMPLACEMENT Le VRE doit être situé dans un endroit chauffé où il sera possible d’en effectuer l'entretient convenablement. Généralement, le VRE doit être situé dans la chambre des appareils mécaniques ou à proximité. S’il n’y a pas de sous-sol ou si le sous-sol ne convient pas, il est possible d’installer l’appareil dans la lingerie ou dans la buanderie.
  • Page 33: Installation Au Plafond

    MONTAGE INSTALLATION AU PLAFOND 1 À l'aide de la vis avec rondelle, montez le support de montage à 2 À l'aide de la vis avec rondelle, montez les supports au bas de l'unité. travers l'isolant en caoutchouc. Assurez-vous que le support est droit. 3 Faites glisser l'unité...
  • Page 34: Installation Murale

    MONTAGE INSTALLATION MURALE 1 À l'aide de la vis avec rondelle, montez le support de montage à 2 À l'aide de la vis avec rondelle, montez les supports au bas de l'unité. travers l'isolant en caoutchouc. Assurez-vous que le support est droit. 3 Faites glisser l'unité...
  • Page 35: Équilibrage Du Débit D'air

    ÉQUILIBRAGE DU DÉBIT D'AIR SI LES FLUX D’AIR DE L’APPAREIL NE SONT PAS CORRECTEMENT ÉQUILIBRÉS… • L’EFFICACITÉ DE L’APPAREIL PEUT ÊTRE RÉDUITE. • DES DOMMAGES AU NOYAU DE RÉTABLISSEMENT DE LA CHALEUR PEUVENT SURVENIR. • UN REFOULEMENT DE L’AIR DANS VOS APPAREILS DE CHAUFFAGE À COMBUSTION •...
  • Page 36: Étapes De Balancement

    Mesure du flot d'air en utilisant la méthode du poste de mesure des débits 1 Percez un trou dans le conduit et insérez 2 Avant de prendre la lecture, assurez vous 3 Réglez le registre « Supply Air Out » (sortie le poste de mesure des débits.
  • Page 37: Commandes Murales

    COMMANDES MURALES * Veuillez consulter les manuels d’instructions des dispositifs de commande individuels pour connaître la bonne configuration de câblage et l’installation adéquate des systèmes de commande. Assurez-vous que l’appareil n’est pas branché lorsque vous reliez la commande. Les raccords de câblage peuvent être retirés pour faciliter le branchement. COMMANDES CENTRALES Ceux-ci ne peuvent pas être utilisés avec une autre commande centrale (+ →...
  • Page 38 COMMANDES MURALES (SUITE) COMMANDE AUXILIAIRE – Ces commandes peuvent être associées à des commandes centrales ou combinées ensemble. (+ → + ; - → -) *Conserver la polarité entre la commande et le VRE SÉRIE T CARACTÉRISTIQUES RELIER À • Minuterie de 20/40/60 minutes avec trois voyant à DEL. •...
  • Page 39: Schémas Électriques

    Schémas électroniques...
  • Page 40 Schémas électroniques (SUITE) CONNEXION ÉLECTRIQUE Bornes pour Accessoire de Contrôle Standard Standard Furnace Interlock Wiring À UNE SYSTÈME À AIR BORNES DU PULSÉ THERMOSTAT TERMINALS TERMINALS FOUR QUATRE FILS WIRE DEUX FILS TWO WIRE chauffage seulement heating only DANS LE CAS D'UNE FOURNAISE RACCORDÉE À...
  • Page 41: Hiérarchie / Opérations De Contrôle

    HIÉRARCHIE / OPÉRATIONS DE CONTRÔLE Étiquette de bornier Description Fonction d'arrêt à distance (contact sec) – lorsque les bornes S+ et S- sont court-circuitées, le produit de venti- lation est forcé en mode veille jusqu'à ce que le contact sec soit ouvert. Lignes de communication numériques pour contrôleurs à...
  • Page 42: Dépannage

    DÉPANNAGE Problème Causes Solutions L’air est trop sec – Le déshumidistat est réglé trop bas – Augmentez le niveau voulu d’humidité. Faites passer le mode de ventilation de « continu » à « attente ». – Le VRE est déséquilibré –...
  • Page 43: Instruction De Nettoyage Du Noyau Récupérateur D'énergie

    INSTRUCTIONS DE NETTOYAGE DES FILTRES ET DU NOYAU RÉCUPÉRATEUR D'ÉNERGIE Pour un bon entretien de vos filtres et de votre noyau de récupération d'énergie suivez ces instructions Pour retirer la porte, retirez la vis de verrouillage et la rondelle sur le côté de l'unité.
  • Page 44: Tableau D'entretien Du Vre

    * L'horaire peut être modifiée au besoin. Un entretien plus fréquent pourrait être nécessaire selon la sévérité des environnements • Greentek se réserve le droit de fournir internes et externes de votre maison. des pièces remises à neuf comme pièces de rechange.
  • Page 45: Service Manual

    Service Manual - P 0.7E Service Manuel - P 0.7E P 0.7E BOM # Description (463986) Motor, R2E133 Radical replacement kit 428673 Electrostatic Filters Kit 8” x 8.3” 405116 Heat Recovery Cell 422731 Capacitors 5uF 410220 kit,RV-CTRL,Replacement,H:F 428252 Auto-Transformer 411963 Control Switch 410213 Collar 4"...
  • Page 46 NOTES...
  • Page 47 NOTES...
  • Page 48 Greentek reserves the right to make technical changes. Greentek se réserve le droit de faire des changements tech- For updated documentation please refer to www.greentek.ca niques. Pour de la documentation à jour, s'il vous plaît se référer au www.greentek.ca Greentek®...

This manual is also suitable for:

P 0.7e

Table of Contents