Installing The First Smartslice I/O Unit - Omron GRT1-CRT - 05-2008 Operation Manual

Componet communications unit
Table of Contents

Advertisement

Installing a SmartSlice I/O Terminal
Note
Removal Procedure
3-1-2

Installing the First SmartSlice I/O Unit

2. Press the CompoNet Communications Unit with force until you hear it lock
on the DIN Track.
After you install the CompoNet Communications Unit, make sure that it is
locked correctly on the DIN Track.
(2) Make sure that the installation hooks on
Installation hook
DIN Track
Installation hook
If the installation hooks do not lock correctly, release the hooks first, push the
CompoNet Communications Unit against the DIN Track, and then lock the
hooks. The subsequent page shows how to release the hooks.
Use a flat-blade screwdriver or equivalent tool to pull out the hooks. This will
unlock them. Then pull out the CompoNet Communications Unit in a perpen-
dicular direction to the DIN Track.
Installation hook
DIN Track
Installation hook
Press the SmartSlice I/O Unit along the side of the CompoNet Communica-
tions Unit to install it. It must engage with the CompoNet Communications
Unit.
Press the SmartSlice I/O Unit until you hear it lock on the DIN Track.
the Unit are locked on the DIN Track.
CompoNet Communications Unit
Flat-blade screwdriver
Section 3-1
(1) Press with force.
CompoNet
Communications Unit
23