Guide Roller Assembly-+++++Eeeeeeeeseeeseeeeees; S And T Incline Mounting Assemblies - Sony SLV-E105 Service Manual

Table of Contents

Advertisement

3-14. GUIDES
3-14-1. GUIDE ROLLER ASSEMBLY
(See Fig.3-14-1)
1)
Unscrew
the two screws @). When
you do this, be
careful not to damage the cylinder or the video head.
2)
Remove
the
two
guide
roller
assemblies @ by
unscrewing them anticlockwise.
ASSEMBLY NOTES:
1.
Tighten the two screws (@ to a torque of 600 g/cm.
After tightening, apply a screw-locking glue.
2.
After replacing the parts, be sure to clean the guide
roller and carry out tape path adjustment as described
in section 4-3.
@Guide
roller
~~~
assembly
Fig.3-14-1
5-21
3-14-2.S AND T INCLINE MOUNTING ASSEMBLIES
(See Fig.3-14-2)
1)
Refer to section 3-2 and remove the mechanism unit.
2)
Refer to section 3-5-2 and remove the cylinder unit.
3)
Refer to section 3-1 and rotate the loading motor
in
the PLAY direction until tape loading is completed.
4) *Shift the S incline mounting assembly slightly, in
the direction of the arrow @), then remove it from the
S load lever assembly @.
5)
Shiftthe T incline mounting assembly@) slightly, in the
direction of the arrow ©, then remove
it from the T
load lever assembly @).
ASSEMBLY
NOTES:
1.
Apply grease SGL-505
to the rail (top, underside
and sides) on the mechanism chassis.
2.
When
fitting the S and T incline mounting
assem-
blies@ and@
into the rail, turn the loading
motor
manually in the EJECT direction. When
tape unload-
ing begins, watch
out in case the S and T incline
mounting assemblies @) and @ get caught in the rail.
3.
After replacing the parts, clean the cylinder and the
roller guide, then adjust the tape path as described in
section 4-3.
®
é
a
S incline mounting
~
assembly
|
lar incline
@S load lever
;
mounting
assembly
assembly
ee
Apply grease to the of} i
top, underside and —>
@T
load lever
sides of the rail.
assembly
aoa
Fig.3-14-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slv-e110itRmt-v166b

Table of Contents