Installing The Switch In A 19-Inch Rack; Rack-Mounting Procedure At A Glance; Chassis Dimensions; Rack Requirements - HPE Networking Comware 5960 Switch Series Installation Manual

Table of Contents

Advertisement

Installing the switch in a 19-inch rack

Rack-mounting procedure at a glance

Figure2-2 Rack-mounting procedure
Select an installation position for
the mounting brackets (near the
port side or power supply side)
NOTE:
If a rack shelf is available, you can put the switch on the rack shelf and slide the switch to a position
so that the mounting brackets are flush against the front rack posts. Then use screws to secure the
mounting brackets to the rack.

Chassis dimensions

Figure2-3
24x100G/200G+8x400GQDD Sw.
Figure2-3 HPE NW CW 5960 24x100G/200G+8x400GQDD Sw dimensions with mounting
brackets installed at the port side
(1) Fan tray handle
Figure2-4 HPE NW CW 5960 24x100G/200G+8x400GQDD Sw dimensions with mounting
brackets installed at the power supply side
(1) Fan tray handle

Rack requirements

To mount the switch in a 19-inch rack, make sure the rack meets the requirements in Table2-1.
Attach the
mounting brackets
to the switch
and
Figure2-4
show
Connect the
Attach the chassis rails
grounding cable to
to the switch
the
dimensions
(2) Mounting bracket
(2) Mounting bracket
6
Attach the slide
rails to the rack
the switch
of
the
HPE
NW
Mount the switch
in the rack
CW
5960

Advertisement

Table of Contents
loading

Table of Contents