Installing the switch in a 19-inch rack

Installation accessories

Table 5 Installation accessories for the HPE 5510 HI switches
Chassis
HPE 5510 24G 4SFP+ HI
HPE 5510 48G 4SFP+ HI
HPE 5510 24G SFP
4SFP+ HI
HPE 5510 24G PoE+
4SFP+ HI
HPE 5510 48G PoE+
4SFP+ HI
Figure 2 Rack-mounting procedure (1)
Identify the mounting position (port
side, power side, or middle
position) for the mounting brackets
Figure 3 Rack-mounting procedure (2)
Identify the mounting
position (port side or
power side) for the
mounting brackets
NOTE:
If a rack shelf is available, you can put the switch on the rack shelf, slide the switch to an appropriate
location, and attach the switch to the rack by using the mounting brackets.
Installati
on
Installation requirements
accessori
es
Front
The mounting bracket kit can be
mounting
installed on the port side, power
bracket
supply side, or the mid-mounting
kit
position.
Front
The front mounting bracket kit must be
mounting
installed on the mid-mounting
bracket
position.
kit
The mounting bracket kit can be
installed on the port side or power
Front and
supply side.
rear
mounting
The distance between the front
bracket
rack post and the rear rack post
kits
must be in the range of 429 to 595
mm (16.89 to 23.42 in).
Attach the front
mounting brackets to the
two sides of the switch
Attach the front
Attach the load
mounting
bearing screws to
brackets to the
two sides of the
switch
7
Mount the switch in the rack
Attach the
rear
mounting
the switch
brackets to
rack posts
Installation procedure
See
"Rack-mounting by
using front mounting
brackets."
See
"Rack-mounting by
using front mounting
brackets."
See
"Rack-mounting by
using front and rear
mounting brackets (HPE
5510 24G PoE+ 4SFP+
HI and HPE 5510 48G
PoE+ 4SFP+
HI)."
Mount the switch in
the rack