Unpacking And Checking - Huawei NetCol8000-E220 User Manual

Modular indirect evaporative cooling system
Hide thumbs Also See for NetCol8000-E220:
Table of Contents

Advertisement

NetCol8000-E220 Modular Indirect Evaporative
Cooling System
User Manual
Name
(Optional)
Recommended
temperature and
humidity (T/H)
sensor cable,
teamwork control
cable, and
monitoring
communications
cable
Equipotential
ground cable or
ground lug

4.4 Unpacking and Checking

Context
Move the unit closest to the installation position before unpacking it to facilitate
movement and avoid damage.
Procedure
Step 1 Check that the outer package of the unit is intact. If any damage is found, notify
the carrier immediately.
Step 2 Check whether the exterior of the unit is in good condition and free of collision
marks or scratches. If any damage is found, notify the carrier immediately.
Step 3 Check the type and quantity of fittings against the packing list. If some fittings are
missing or do not comply with the models in the packing list, record the
information and contact the supplier immediately.
----End
Issue 10 (2024-01-30)
Recommended Specifications
CAT 5e or higher shielded network cables
● Ground lug: Use hot-dip zinc-coated flat steel sheet with
a cross-sectional area of at least 50 mm
● Ground cable: Use equipotential ground cables with a
cross-sectional area of at least 16 mm
ground cables through a plastic-coated metal hose.
NO TE
During movement, do not tilt it for 90°.
NO TE
● Do not remove the plastic packing materials before connecting pipes and cables to
prevent dust and other foreign matter from entering the unit.
● After pipes and cables are connected, take dustproof and anti-condensation measures in
a timely manner based on site requirements.
NO TE
After the check is complete, keep the accessories properly.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation Guide
2
.
2
and route the
44

Advertisement

Table of Contents
loading

Table of Contents