Upon completion of the above installation steps, double check and ensure that all
Fastening bolts are provided by Zephyr and are properly installed and fastened.
Inspection on tension of Steel wire
Check if the wire rope around the beam is installed correctly, make sure the rope
Head is locked; and double check tensioning degree of the four fastening wire ropes
To ensure the perpendicularity of the motor support and the balance of the chassis.
Fan blade condition check
The fan blade is made of aluminium alloy material with a special fluorocarbon
Paint treatment. Please handle with care during installation to avoid scratches,
Crash or deformation. Any damage on a fan blade might cause noise during operation.
In case any damage occurs, contact Zephyr or the local distributor/dealer to replace the fan
blade.
The information contained in this document is the sole property of Zephyr Fans PTY LTD. Any reproduction in part or as a whole without the written permission of Zephyr Fans PTY LTD is prohibited.
Need help?
Do you have a question about the PULSE HVLS and is the answer not in the manual?
Questions and answers