Daikin RXYQ6BRY16 Installation Manual page 39

Vrv system air conditioner
Table of Contents

Advertisement

Power supply wiring
Be sure to connect the power supply wiring to the
power supply terminal block, pass each phase wire
through separate rubber sleeves and fix with the
included clamps.
Fix the ground wiring with the included clamp by
taking care not to apply external pressure on the
terminal area.
Pass the power supply wiring and ground wiring
through their respective rubber sleeve and fix with
the included clamps to prevent water from entering
the electrical components box.
6
5
7
8
9
1 Power supply (See 12.3 Requirements)
2 Fuse
3 Earth wire
4 Electrical components box
5 Insulation sleeves
6 Power supply terminal block
7 Ground terminal
8 Clamp (accessories)
9 Rubber sleeve
01_EN_3P748230-1.indd 37
How to pass wire through the rubber sleeve:
1
Remove the rubber sleeve (detachable portion).
2
Place the wire.
4
1
3
2
3
Attach the rubber sleeve (detachable portion).
Attach by inserting the electrical components box
edge into the slit of the rubber sleeve.
4
Fix with a clamp.
Fix by passing the clamp through the hook on the back.
Electrical
components
box edge
37
23/01/2023 17:24:39

Advertisement

Table of Contents
loading

Table of Contents