Download Print this page
Omni Bead Ruptor Quick Start Manual

Omni Bead Ruptor Quick Start Manual

15 ml tube carriage

Advertisement

Quick Links

Bead Ruptor
15 mL Tube Carriage
Quick Start Guide

Advertisement

loading

Summary of Contents for Omni Bead Ruptor

  • Page 1 Bead Ruptor 15 mL Tube Carriage Quick Start Guide...
  • Page 2 This page was intentionally left blank...
  • Page 3 Bead Ruptor Hub 1. Align slots in the center of the tube carriage to the ridges on the Bead Ruptor Hub. The “UP” marker should be at the top of the unit. 2. Place the lock ring on the hub.
  • Page 4 9 mL Cooling Unit. 8 mL 6 mL 5 mL TUBE COMPATIBILITY: Only use Omni International 15 mL conical tubes. 4 mL 3 mL The 15 mL Tube Carriage has been optimized for this tube geometry. 2m L 1 mL...
  • Page 5: Troubleshooting

    Troubleshooting In the instance that the lock ring or finger plate become stuck in the locked position, the Allen key must be inserted into the lock ring or finger plate as shown here. Use the Allen key to losen the Lock ring or Finger plate. Please call if further assistance is needed at 1-800-776-4431 Finger Plate Lock Ring...
  • Page 6 This page was intentionally left blank...
  • Page 7 This page was intentionally left blank...
  • Page 8 935C Cobb Place Blvd. Kennesaw, GA 30144 800.776.4431 • 770.421.0058 www.omni-inc.com PN: 03-289 Rev. I...