Power Switch - Bunn Premia 61000.0000 Installation & Operating Manual

Bean-to-batch medium to high volume brewer
Hide thumbs Also See for BUNN Premia 61000.0000:
Table of Contents

Advertisement

1. With the water supply line connected to the unit,
turn the water on & check for leaks.
2. Open Lower door.
3. Connect the unit to the power source (plug it in).
4. Turn the unit on by setting the power switch to
the ON position.
5. The door must be closed to begin the
initialization sequence, it may take 60-90
seconds, and the machine will reset in
preparation for user operation.
INITIAL SETUP
14

Advertisement

Table of Contents
loading

Table of Contents