Drain and Waste Bin Setup
The waste bin and drain line will require cutting a hole through the counter before the machine can be
installed. Refer to the diagram below for cut-out placement and measurements.
1.
The drain hoses connect to the barb fittings
located between the power cord and water inlet
fitting.
2. The cut-out on the countertop for the waste bin
should align with the grounds chute behind the
lower front door (when the grounds chute is in
the down position).
Note: Image showing grounds chute in the up
position.
INITIAL SETUP
10
grounds
chute
cut out