Figure 2-36.
4.
Figure 2-37.
1
2
3
5.
Installation
Removing Fork Connectors
Remove the junction box cover. Use a utility knife to remove the knock-outs (Item 2)
in the junction box (Item 1) and feed the wires from the solar controller into the
junction box, and through the solar controller lock nut (Item 3).
Wiring Solar Power – External Regulator
Junction box
Knock-outs
Lock nut
Use the solar controller lock nut to attach the solar controller to the junction box,
and use a 7/32" flat head screwdriver to attach the wires from the controller to the
junction box connectors as shown.
FB2100 Flow Computer Instruction Manual
D301783X012
November 2023
49