Emerson FB2100 Instruction Manual page 113

Flow computer
Hide thumbs Also See for FB2100:
Table of Contents

Advertisement

Figure 5-14.
14.
15.
Service and Troubleshooting
Threading the Battery Strap
Pick up the new battery and carefully ease it into the battery compartment with the
writing on the battery facing out and the connectors on the upper right-hand side.
Nothing (including the strap) can be behind the battery.
Figure 5-15.
Easing the Battery into the Battery Compartment
Carefully push the battery under the solar regulator (if present) and against the
back of the compartment, now strap it in tightly by pulling the ends of the strap.
FB2100 Flow Computer Instruction Manual
D301783X012
November 2023
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fb2200

Table of Contents