5.2 Unpacking

When the battery arrives at the installation site, it must be unloaded and stored properly
and prevented from the direct sunshine and rain. Before installation, check if there is any
component missing according to 2.2 Packing List and check whether the box appearance
is intact;
Carefully handling the unpacking to preserve the insulation coating on the casing's surface;
Please contact PYTES if there is any damage or missing of products and / or components.

5.3 Installation

Note
All installation and operation must comply with local electrical standards.
5.3.1 Single Stack Parallel Installation
5.3.1.1 Place Pi LV1 Base to Determine Specific Installation Location
1) Place the Pi LV1 along the wall. Leave 30mm~35mm/1.18~1.38inch between back of Pi LV1
base and wall.
5.3.1.2 Team Lift to Stack up Pi LV1
2) Place the Pi LV1 BMU onto base. Pay attention to BMU direction so that the connectors of
base and BMU are at the same side. Fix the BMU to base with Locking Pieces*2 and M5x10*8
Screws.
BMU
M5*10 Screw
Locking Piece
Base
16
Front