4-4-8
Pig.4-31
-!
White
COKE
Rice,
4-13
Shutter actuator
lever
Beware
of the installing direct-
ions of the springs(D54, D99).
Oiling: L-1 to the shafts
G4 to the hooks
D54
Mirror double gear
(D40)
Mirror double gear(D40) determines the relative position of
Dia. charge gear(D32) as against Restoring gear(D24).
Install the double gear while pulling the Dia. actuator lever up
with a finger, providing 0.3mm
clearance at the hook as shown in
Fig. 4-40.
Oiling: G-3.on the gear teeth and bearings.
0.3mm
clearance
D40
Pig. 4-32
Oiling points
Major oiling points to the shutter mechanism are shown in Fig.
4-34, located in the next page.
WIRINGS
Terminal
locations for each wire
are
shown in Fig. 4-111.
Two leads (pink and brown leads) to the rotary SW(E128) must be
soldered
before the rotary SW
is installed.
The terminals
for the
leads are located on the reverse
side of the SW plate.
Stuff the ex-
cess portion of the wirings
into the opening under the circuit board
or wiring board.
Opening
White
Brown
Pig.4-33