Download Print this page

ASAHI PENTAX 6x7 Service Manual page 75

Hide thumbs Also See for PENTAX 6x7:

Advertisement

4-12
G
Mirror
hook and timing
checker
lever
Install Mirror
hook(D66)
and Timing
checker
lever(D59)
with
Hook
springs(D57
x2).
Beware
of installing directions
of the springs.
Oiling is shown
in Fig. 4-28.
Note:
Assure
that the checker
lever moves
smoothly when the shutter is cock-
ed, after assembling.
If a wrong
ope-
G4
D57
D59
ration is observed, file off the por -
Z
tion shown, slightly.
\
Pig.4- 28
G4
D59
or
D57
D56
(File
off,here)
H
2nd curtain actuator (D72)
Assemble the 2nd curtain actuator (D72)with Actuator spring(
D76) to the actuator
charge lever.
Oiling:A proper
amount
of L-1
to the shaft.
Shaft (D69)
D76
Fig.4-29
I
Intermediate
levers
Three
intermediate
lever
collarsare the same
one after another,
and Parts No,
are also the same.
However, it is recommended
to
handle
each lever and collar coupled,
as coupled parts, when disas-
sembling
or assembling
them.
Assure
that the each lever moves
smoothly
after assembling.
Oiling:
A very small amount
of L-1,
between
each lever and collar.
Fig.4-30

Advertisement

loading