Installing The Sub Pole Cup On Sub215 - 1 Sound Contour Series Manual

Rigging system
Table of Contents

Advertisement

THE CONTOUR CT28 RIGGING SYSTEM
Figure 42. Sliding the mounting block to fix the tilt
angle.
Figure 43. Sliding the tilt mechanism to align the
required tilt angle (+20° upward tilt in the pole-
mount configuration shown).
• With the M10×100 ball-lock pin removed, slide the mounting
block of the tilt mechanism to align the holes in the block with
the holes in the arched plates corresponding to the required tilt
angle (see diagrams above).
Figure 44. Inserting the ball-lock pin to fix the
tilt angle (+20° tilt in the pole-mount configuration
shown).
• When the required holes are perfectly aligned, take the other
M10×100 ball-lock pin supplied with the Contour Rigging
System and press the lock-release button on the rear of the pin
to allow it to pass into the hole. Insert it into the holes, pushing it
completely through the aligned holes until the ball-lock emerges
from the far side.
Figure 45. A +20° tilt angle fixed for the pole-mount
configuration.
• When it emerges, release the button to allow the lock to engage
and assure that the pin cannot be removed without again
pressing the release. The enclosure is now ready to mount on
an Active Speaker Tube.

Installing the Sub Pole Cup on SUB215

In order to deploy a CT28 unit in a sub/satellite configuration atop a
SUB215 subwoofer unit, the subwoofer must first be equipped with a Sub
Pole Cup.
Figure 46. Removing SUB215 cover
plate.
• Using a 4 mm hex wrench, remove the four screws retaining
the pole cup cover on the top side of the SUB215 cabinet, and
remove the cover plate.

Advertisement

Table of Contents
loading

Related Products for 1 Sound Contour Series

This manual is also suitable for:

Contour ct28

Table of Contents