Download Print this page

Viavi E4100 Series Quick Card User Manual page 3

Advertisement

Connect to Fiber Under Test (FUT):
The Launch Cable may be connected to the FUT
via an optical patch panel (OPP) or an optical
coupler:
1. If the interface to the FUT is a patch cord,
connect the patch cord to an optical coupler with
the same connector type.
2. Inspect the FUT connected to the coupler or
OPP.
3. Inspect the other fiber end face of the Launch
Cable.
4.
Connect the Launch Cable to the coupler or OPP.
Run Test:
1. Tap
to start the test. After auto-
configuration, the OTDR will perform a
connection check to ensure that the connection
is Good. If the Connection is Bad, disconnect the
launch cable, repeat steps 1 through 3 on page 1,
and repeat steps 1 through 4 above on page 3,
ensuring all fiber end faces are clean.
2.
The T-BERD/MTS will perform acquisitions at the
configured wavelengths. Overall test results
(Pass or Fail) will be displayed in a pop-up
window. Tap the window to close it.
• SmartLink view: The FUT is displayed as a
series of icons representing each event
(connector, splice, bend, etc.). The center of
the display (Link Table) shows summary
results for the entire span. Acquisitions for
which all events are acceptable are marked
with a green check
events that exceed pass/fail thresholds for
loss or reflectance are marked with a red
The lower display (Alarms) shows each event
that exceeds thresholds. Softkeys can be used
to alter the display:
Tap any icon in the upper display to
show detailed results for the event.
Detailed results are shown for all
events.
. Acquisitions with
.
ONA-800
Figure 7: Connecting the Launch Cable to the FUT with a coupler
ONA-800
Figure 8: Connecting the Launch Cable to an OPP
Figure 9: Connection Check
Figure 10: SmartLink View
VIAVI Solutions

Advertisement

loading

This manual is also suitable for:

Ona-800