Recommended Order of Installation
1. First, install the I/O card.
2. Connect all cables into the I/O card.
3. Install the NAM.
4. Go to the 2-Slot Housing Installation Instructions (Document No. 9000-A2-GN15),
5-Slot Housing with AC Power Supply Installation Instructions (Document
No. 9000-A2-GN16), or 5-Slot Housing with DC Power Supply Installation
Instructions (Document No. 9000-A2-GN1C) for power-up verification procedures.
Tools Required
A small Phillips screwdriver (#1 or #2) to install the T1 NAM
A small, flat-blade screwdriver to install the:
— I/O card
— Cable connections
3