Ending An Active Test - Paradyne 7520 User Manual

Zhone 7520 dsu: users guide
Hide thumbs Also See for 7520:
Table of Contents

Advertisement

Testing

Ending an Active Test

5-10
A test initiated by the user can be ended by the user.
A Test Timeout option is available to automatically terminate a user-initiated
Loopback or Pattern test after it has been running a specified period of time.
Refer to Table A-1,
System
Test Timeout does not pertain to tests commanded by the:
— Network, such as the network-initiated CSU and DSU Loopbacks.
— DTE, such as the DTE-initiated Local Loopback.
On each test screen is a command column. Pressing Enter when the cursor
is on the Stop command stops the test.
Use the Abort All Tests selection from the Test menu to stop all tests running
on all interfaces, with the exception of network or DTE-initiated loopbacks.
Command Complete appears when all tests on all interfaces have been
terminated.
Options.
May 1998
7520-A2-GB20-20

Advertisement

Table of Contents
loading

Table of Contents