Download Print this page

Quick Reference; Quick Start Procedure - Paradyne ACCULINK 3150 Quick Reference

Zhone 3150 csu: reference guide
Hide thumbs Also See for ACCULINK 3150:

Advertisement

ACCULINK 3150 CSU

Quick Reference

Document Number 3150-A2-GL11-60
February 1998

Quick Start Procedure

The following procedure is offered for experienced CSU users who are familiar with the
3150 CSU installation process and have no special requirements for their application.
Refer to the ACCULINK 315x Channel Service Unit Operator's Guide (Document No.
3150-A2-GB21) for more information.
1. Attach the power cord to the rear of the CSU and the other end to a grounded
115 Vac power outlet.
2. Attach the DTE cable (DB15) and the 8-pin network cable to the DTE and
NETWORK connectors, respectively, located on the CSU rear panel. Then,
connect the other end of the DTE cable to the CPE. Connect the other end of the
network cable to the RJ48C jack provided by the telephone company. See
Appendix D, Pin Assignments , in the Operator's Guide for more information.
3. Power on the CSU to perform the power-up self-test. See the Power-Up Self-Test
section in Chapter 2 of the Operator's Guide for more information.
4. If you intend to use front panel emulation, connect the cable from the PC to the
COM port on the rear panel of the CSU.
NOTE:
To configure the CSU remotely, refer to the Acquiring/Releasing the User
Interface section in Chapter 3, Operation, in the Operator's Guide .
5. If you intend to manage the 3150 CSU with SNMP, cable either the COM or
MODEM port (as appropriate for your configuration). Then, configure the SNMP
management link. See Chapter 3, Operation, and Appendix C, Configuration
Options, in the Operator's Guide for more information.
6. The Factory 1 configuration for ESF framing format and B8ZS line coding format is
the default configuration and is appropriate for most networks. If this configuration
does not work for you, try the Factory2 configuration for D4 framing format and AMI
line coding format. To further customize configuration options, refer to Changing
Configuration Options in Chapter 3, Operation , and to Appendix C, Configuration
Options, in the Operator's Guide .
7. During the power-up self-test, the FAIL LED flashes, then all LEDs blink twice.
When the test is complete, verify that the CSU is functional by observing that the
OK, NETWORK SIG, and DTE SIG LEDs are lit.
TM
1

Advertisement

loading