Considerations For Test Setup - Rohde & Schwarz NPA Getting Started

Power analyzers
Table of Contents

Advertisement

®
R&S
NPA
To mount the product in a rack
1. Use an adapter kit to prepare the R&S NPA for rack mounting.
a) Order the rack adapter kit designed for the R&S NPA power analyzers. For
the order number, see the specifications document.
b) Mount the adapter kit. Follow the assembly instructions provided with the
adapter kit.
2. Lift the R&S NPA to shelf height.
3. Push the R&S NPA onto the shelf until the rack brackets fit closely to the rack.
4. Tighten all screws at the rack brackets with a tightening torque of 1.2 Nm to
secure the R&S NPA at the rack.
To unmount the product from a rack
1. Loosen the screws at the rack brackets.
2. Bring the lifting equipment to shelf height.
3. Remove the R&S NPA from the rack.
4. If placing the R&S NPA on a bench top again, unmount the adapter kit from
the R&S NPA. Follow the instructions provided with the adapter kit.
4.5

Considerations for test setup

Cable selection and electromagnetic interference (EMI)
Electromagnetic interference (EMI) can affect the measurement results.
To suppress electromagnetic radiation during operation:
● Use high-quality shielded cables, for example:
– Double-shielded data cables for connecting external devices. The length of
data cables must not exceed 3 m.
– Shielded cables (RG58/U coaxial cable) for signal transmission connec-
tions. The length of signal cables must not exceed 1 m.
– Double-shielded USB cables. The length of passive USB cables must not
exceed 1 m.
– CAT6+ LAN cables, e.g. RJ-45 with a length ≤3 m.
Getting Started 1179.1629.02 ─ 03
Preparing for use
Considerations for test setup
19

Advertisement

Table of Contents
loading

Table of Contents