TILE OVER
4. Build the fall to waste
a. Apply primer to the tray surface to prepare for screeding. Leave clear a 170 x 170 mm
square around the waste recess for the Waste Tiling Rim to be installed.
b. Build the required fall to the waste.
5. Wallboard Installation:
Run a continuous bead of MS adhesive at 10 mm from the top of upstands.
Install wall board.
Position fixing above upstand into timber framing to secure the joint between tray and wall.
1598330-A02-A
Stainless Steel Trays
March 2024
INSTALLATION INSTRUCTIONS
Covered Waste Opening
Page 6
Screed.
Stainless Steel Tray
Continuous bead of
MS Adhesive
englefield.co.nz