  • Page 2 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK.
  • Page 4 Notices Manual Part Number © Keysight Technologies 2006 - 2023 Table 1 Keysight Call Centers No part of this manual may be reproduced E2240-90000 in any form or by any means (including United States Test and electronic storage and retrieval or transla-...
  • Page 5: Table Of Contents

    Minimum Power Requirements Power Recommendations Additional Power Information Mains Disconnect Requirements Disconnect Circuit Breaker Requirements Mains Circuit Breaker Requirements Site Configuration for AC Power Important recommendations about wiring Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 6 Palm Rest Connect Keyboard and Mouse Installation Procedure for TS-5040 Monitor Arm Pole Monitor Arm Keyboard Tray Installation Procedure for TS-5040 PC and Peripheral Connections Power Strip Breakers Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 7 Installing Monitor Arm and Clamp Figure 4-7 Installing Keyboard Tray Figure 4-8 PC and GPIB Connector Panel Figure 4-9 Monitor Power Connector Figure 4-10 Filtered Power Strip Circuit Breakers Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 8 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 9 Environment Requirements Table 2-2 Safety Symbols and Regulatory Markings Table 2-3 Suggested Anti-Static Solutions for Site Planning Table 3-1 Test System Rack Dimensions Table 3-2 AC Power Requirements Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 10 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 11 Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide Legal Information Warranty Technology Licenses Restricted Rights Legend Service And Support Keysight On The Web Keysight By Phone...
  • Page 12: Legal Information

    Keysight shall not be liable for errors or for incidental or consequential damages in connection with the furnishing, use, or performance of this document or of any information contained herein.
  • Page 13: Service And Support

    Latin America: 305 269 7548 Asia-Pacific: (85 22) 599 7777 Manufacturing Address Keysight Technologies Microwave Products (Malaysia) Sdn. Bhd. Bayan Lepas Free Industrial Zone, 11900 Penang, Malaysia. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 14 Legal Information THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 15: Safety And Regulatory Information

    Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide Safety and Regulatory Infor- mation Safety Information Safety Summary Safety Notice General Environmental Conditions Before Applying Power Ground The System Fuses Operator Safety Information Safety Symbols and Regulatory Markings...
  • Page 16: Safety Information

    Products that appear damaged or defective should be made inoperative and secured against unintended operation until they can be repaired by a qualified service personnel. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 17: Environmental Conditions

    Safety and Regulatory Information The protection provided by the TS-5020 system may be impaired if the system is used in a manner not specified by Keysight. Environmental Conditions The TS-5020 Automotive Electronics Functional Test System and the TS-5040 Compact Functional Test System are designed for indoor use only.
  • Page 18: Fuses

    Table 2-2 defines the symbols and markings you may find in a manual or on an instrument. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 19: Table 2-2 Safety Symbols And Regulatory Markings

    Regulatory markings The CE mark is a registered trademark of the European Community. If it is accompanied by a year, it indicates the year the design was proven. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 20 Radio Communications Act of 1992. This text indicates that the instrument is an Industrial Scientific and Medical Group ISM - 1A 1 Class A product (CISPER 11, Clause 4). Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 21: Declaration Of Conformity

    Safety and Regulatory Information Declaration of Conformity The Declaration of Conformity (DoC) for this instrument is available on the Keysight website. You can search the DoC by its product model or description at the web address below. http://www.keysight.com/go/conformity If you are unable to search for the respective DoC, contact your local Keysight representative.
  • Page 22: Electrostatic Discharge (Esd) Precautions

    Do not move the crate or the test rack and pallet to a static sensitive area until you have removed the plastic wrap from the test rack. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 23: End Of Life: Waste Electrical And Electronic Equipment (Weee) Directive 2002/96/Ec

    “Monitoring and Control Instrumentation” product. Do not dispose in domestic household waste To return unwanted products, contact your local Keysight office, or see: http://www.keysight.com/environment/product for more information. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 24 Safety and Regulatory Information THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 25: Site Preparation And Power Requirements

    Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide Site Preparation and Power Requirements Preparing Your Site for the System Typical System System Dimensions System Plan Drawing System Power Requirements Minimum Power Requirements Power Recommendations Additional Power Information...
  • Page 26: Preparing Your Site For The System

    The protection provided by the TS-5020 system and the TS-5040 system may be impaired if used in a manner not specified by Keysight. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 27: Typical System

    P/N E1400-61605 Only required with E1135C PDU N6700B "Olympus" Power Supply Power supplies customer selectable Front view Rear View Figure 3-1 TS-5020 Automotive Electronics Functional Tests System Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 28: Figure 3-2 Ts-5040 Rack Layout (Rear Mount)

    Site Preparation and Power Requirements Figure 3-2 shows the TS-5040 (rear mount) system rack layout and rack dimensions. Figure 3-2 TS-5040 Rack Layout (Rear Mount) Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 29: Figure 3-3 Ts-5040 Rack Layout (Top Mount)

    Site Preparation and Power Requirements Figure 3-3 shows the TS-5040 (top mount) system rack layout and rack dimensions. Figure 3-3 TS-5040 Rack Layout (Top Mount) Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 30: System Dimensions

    E3858B PDU. The Remote ON/Standby switch at the upper right-hand corner of the system rack turns off all equipment. The Main ON/OFF switch is located on the Keysight E1135C or E3858B Power Distribution Unit (PDU), located behind the rear...
  • Page 31: Figure 3-4 Recommended Ts-5020 Automotive Electronics Functional Layout

    Roll the system to its final position. Lower its leveling feet to stabilize the system and prevent it from moving. Figure 3-5 Recommended TS-5040 Automotive Functional Test System Layout (overhead view) Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 32: System Power Requirements

    (PDU), either the Keysight E1135C or E3858B, depending on the option chosen. • AC voltage and current ratings: see Table 3-2 • Power cord for all systems and options to be supplied by customer. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 33: Power Recommendations

    • Use copper wire for the system drop between the AC source and system. • For Keysight E1135C PDU, a jumper wire may need to be installed for some options. This PDU has a mains disconnect switch that serves as master power for the entire rack.
  • Page 34: Figure 3-7 E3858B Mains Switch And Input

    The mains plug shall be inserted into only a socket outlet provided with a protective earth contact. Figure 3-7 E3858B Mains Switch and Input Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 35: Additional Power Information

    Reset the rocker by gently pushing it back in place. These breakers must not be opened by force or permanent damage can result. Damage caused by intentionally opening the breaker is not covered by warranty. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 36: Figure 3-9 Power Strip's Power Connector

    • If 2-pin wall outlet connector (without grounding) is used, external ground cable is required with E2230-31600 for grounding purpose. Figure 3-9 Power Strip’s Power Connector Figure 3-10 Filtered Power Strip/Cord Location Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 37: Mains Disconnect Requirements

    AIC for higher voltage circuit. Site Configuration for AC Power The following information is not required, but may save time and effort implementing this configuration when installing the system. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 38: Important Recommendations About Wiring

    • Use the same lengths of wire for the phase conductors, the neutral, and the ground. • It is extremely important that the neutral and ground be connected only at the transformer using an X-O bond. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 39: Safety Ground Connection

    Site Preparation and Power Requirements Safety Ground Connection As the Keysight TS-5020 & TS-5040 is connected to the AC mains by means of a plug/socket connection, a permanent earth ground must be supplied to reduce the risk of electric shock.
  • Page 40: Ventilation

    Use a dry cloth or one slightly dampened with water to clean the external case parts. Do not attempt to clean internally. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 41: System Transportation Instructions

    Deploying the rack from its shipping carton requires moving it in the Back- to-Front direction. NEVER stand directly in front of the rack when loading or unloading from a shipping carton. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 42 Site Preparation and Power Requirements THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 43: Installing The Keyboard, Mouse, And Printer

    Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide Installing The Keyboard, Mouse, and Printer Tools Required Installation Procedure for TS-5020 Printer Tray Mouse Tray Palm Rest Connect Keyboard and Mouse PC and Peripheral Connections Power Strip Breakers...
  • Page 44: Tools Required

    These nuts are located immediately below the flat panel display. If you need to locate the shelf elsewhere, four additional captive nuts are included with the shelf kit. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 45: Installation Procedure For Ts-5020

    Attach the printer tray to the keyboard shelf. Make sure that the two hooks engage the shelf and the bottom of the tray is inserted into the tab under the keyboard shelf. Figure 4-1 Attaching Printer Tray Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 46: Mouse Tray

    Attach the mouse tray to the keyboard shelf. Make sure that the two hooks engage the shelf and the bottom of the tray is inserted into the tab under the keyboard shelf. Figure 4-2 Attaching Mouse Tray Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 47: Palm Rest

    Installing The Keyboard, Mouse, and Printer Palm Rest Install the plastic palm rest by slipping it into the sots in the keyboard shelf. Figure 4-3 Installing Palm Rest Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 48: Connect Keyboard And Mouse

    PC serial ports. Power (ac mains) is provided at the PDU. You can route the ac power cable through the holes underneath the Test System Interface to the back of the system rack. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 49: Installation Procedure For Ts-5040

    Installing The Keyboard, Mouse, and Printer Installation Procedure for TS-5040 Monitor Arm Pole Figure 4-5 Attaching Monitor Arm Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 50: Monitor Arm

    Install the monitor arm clamp onto the pole and tighten it using the four screws provided. After the clamp is secured, place the monitor arm into the slot as shown below. Figure 4-6 Installing Monitor Arm and Clamp Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 51: Keyboard Tray

    Installing The Keyboard, Mouse, and Printer Keyboard Tray Install the keyboard tray to the monitor arm using the four flat-head screws provided. Figure 4-7 Installing Keyboard Tray Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 52: Installation Procedure For Ts-5040

    Figure 4-9 Monitor Power Connector 3 After securing all cables, you can apply power to the system by setting the front panel on off switch to ON. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 53: Power Strip Breakers

    4-10). When a breaker opens (trips), switch will be flipped to the right side. Flip the switch to left side to reset it. Figure 4-10 Filtered Power Strip Circuit Breakers Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 54 Installing The Keyboard, Mouse, and Printer THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. Keysight TS-5020 and TS-5040 Compact Functional Test System Site Preparation and Installation Guide...
  • Page 55 This information is subject to change without notice. © Keysight Technologies 2006 - 2023 Edition 5, October 2023 www.keysight.com...