Tube Installation Sequence - Re-Verber-Ray MP3 Series Insert Manual

Table of Contents

Advertisement

MP3
Series

Tube Installation Sequence

Chart 2.2
Tube Installation Sequence, Baffle Location, and Secured Joints for Reflectors
20 Foot
25 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
Burner Control Box
w/16 in. Burner Tube
Expansion Joint on
Reflectors
Secured Joint on
Reflectors (see note)
Primary Combustion
Chamber with Clamp
*
Stainless steel clamp on 150,000 BTU/h models (P/N:
TP-220).
*
Stainless steel clamp on 150,000 to 200,000 BTU/h
models (P/N: TP-220).
*
Stainless steel clamp on 150,000 to 200,000 BTU/h
models (P/N: TP-220).
*
Stainless steel clamp on 200,000 BTU/h models (P/N:
TP-220).
2.0
Installation
NOTE: When securing joints on reflectors which are
rotated on an angle from horizontal, secure joint
only on top side of reflector to allow for sufficient
heater expansion and contraction.
0° Mounting Angle
Key
Radiant Tube
Exchanger with Clamp
Baffle Location
Secure vent material to exchanger with three #8
sheet metal screws. Seal with high temperature
silicone sealant. Do not use tube clamp.
*
A secondary combustion chamber is installed as the
second tube downstream from the burner control box on
150,000 to 200,000 BTU/h models.
11
Tube Installation Sequence
1° to 45° Mounting Angle

Advertisement

Table of Contents
loading

Table of Contents