Tube Installation Sequence - Re-Verber-Ray DET3 Series Insert Manual

Positive pressure, two-stage radiant heater system
Table of Contents

Advertisement

DET3
Series
Figure 2.4

Tube Installation Sequence

Important! The combustion chamber(s) & radiant tube section(s) must be installed in the following order.
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
Burner Control Box with
16" Burner Tube
Primary Combustion
Chamber Tube
Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)
NOTE: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 175 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 175-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Key
11
2.0
Installation
Tube Sequence
Hot-rolled Steel Radiant
Emitter Tube
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
Baffle Location
Heater Length