Tube Installation Sequence - Re-Verber-Ray MP-25-80N Insert Manual

Mp series modulating plus tube heater
Table of Contents

Advertisement

MP
Series

Tube Installation Sequence

Figure 2.9 •
Tube Installation Sequence
Important! The combustion chamber & radiant tube sections must be installed in the following order.
25 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
Burner Control Box with
16-inch Burner Tube
Black Coated Combustion
Chamber Tube*
Black Coated Aluminized Combustion
Chamber/Radiant Emitter Tube
P/N: TP-26A
* Aluminized tubes (80,000 to 115,000 BTU/h models) P/N: TP-26A.
* Titan tubes (150,000 to 200,000 BTU/h models) P/N: TP-26B.
NOTE: Refer to the Tube Heater General Manual, Chart 3.6 (Page 23) for secured reflector joints.
Stainless steel clamp location on 200,000 BTU/h models (P/N: TP-220).
Stainless steel clamp location on 200,000 BTU/h models (P/N: TP-220).
Stainless steel clamp location on 200,000 BTU/h models (P/N: TP-220).
P/N: TP-26A, TP-26B
2.0
Installation
Key
Standard Tube Clamp
P/N: TP-21B
Stainless Steel Tube
Clamp (P/N: TP-220)
200,000 BTU/h models only - Located
between 1st and 2nd 10 ft. tube sections.
Baffle Location
17
Tube Installation Sequence

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents