Tube Installation Sequence - Re-Verber-Ray DX3-20-50 Insert Manual

Dx3 series
Table of Contents

Advertisement

DX3
Series

Tube Installation Sequence

Figure 2.4 •
Tube Installation Sequence
Important! The combustion chamber & radiant tube sections must be installed in the following order.
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
70 Foot
80 Foot
Burner Control Box with
16-inch Burner Tube
Black Coated Combustion
Chamber Tube*
Black Coated Aluminized Combustion
Chamber/Radiant Emitter Tube
*Aluminized tubes (50,000 to 125,000 BTU/h models); Titan tubes (150,000 to 200,000 BTU/h models) .
NOTE: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.
Stainless Steel Clamp on 150-175 MBH models (P/N: TP-220).
Stainless Steel Clamp on 150 - 200 MBH models (P/N: TP-220).
Stainless Steel Clamp on 150 - 200 MBH models (P/N: TP-220).
Stainless Steel Clamp Location (P/N: TP-220).
Stainless Steel Clamp Location (P/N: TP-220).
2.0
Installation
Key
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
Baffle Location
11
Tube Sequence
Heater Length

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents