This guide outlines the quick start process for wiring and activating the Duracell
Power Center Max Hybrid 15 kW inverter.
1. Pre-Commissioning Checks
• Ensure safety procedures are understood and PPE is available.
• Confirm you have all tools and equipment necessary for installation.
2. Battery Mode Options and AC Coupling Guide
• Refer to the
operational modes and select the mode according to your system
requirements.
• Review the AC Coupling Guide (page 5 of AC Coupling Guide) for setting up
micro inverters into the Gen (generator) port.
3. Initial Setup and Checks
• PV Input Circuit Check
◦ Verify each PV input circuit voltage does not exceed 500 Voc Temp.
corrected.
◦ Ensure no PV+ or PV- is connected to GND and check polarity.
• Grid Input Voltage Check
◦ Measure voltage between L1 to Neutral and L2 to Neutral to ensure 120 Vac
and 240 Vac, respectively.
◦ Confirm Neutral and Ground are approximately 0 Vac.
• Battery Voltage Check
◦ Ensure voltage is of 45 Vdc – 60 Vdc.
◦ Turn on battery switch and built-in battery disconnect.
◦ Activate batteries using the switch, then press and hold the primary
battery button for 3 seconds to turn on the other batteries.
◦ Turn on Built-in battery disconnect(s) inside the inverter on the left side
labeled BATTERY.
©2024 Power Center
Duracell is a registered trademark of Duracell U.S. Operations, Inc., used under license. All rights reserved.
Manufactured under license and warranty supported by Omega Green Power in San Jose, CA.
Battery Mode Examples (page 11)
Max Hybrid 15 kW
Setup Guide | Quick Start
to understand the inverter's
3

Advertisement

loading