Optional Components; Roll-Up Sides - Bootstrap Farmer DIY High Tunnel Plans Instructions Manual

Hide thumbs Also See for DIY High Tunnel Plans:
Table of Contents

Advertisement

Optional Components

Roll-Up Sides

Parts:
● 2 Roll-up Cranks
● ¾" Inner EMT Couplings
● Snap On Clamps (every 2')
*SNAP CLAMPS ONLY FIT 3/4 EMT-
DO NOT USE PVC PIPES!
● Eye bolts for tie-down ropes.
● ¾ EMT & ½ EMT (Locally
Purchased)
● Paracord or nylon strapping
● #8 screws
1. Drive ½" x 2' EMT into the ground 2' from the house on the x to help secure the
¾" hand crank guide rod. (One for each side)
NOTE: Instructions in the hand crank box ask you to put the crank less than 2', however we have
had better performance 2' away from the building.
2. Place ¾" x 5' EMT on the ½" and gently drive into the ground until the top
reaches your hip board height.
3. Connect your EMT pieces together and secure at each connection point with a
#8 self-tap screw.
4. Place your snap clamps next to your long EMT sections to use during the
covering process.
Need Help? contact@bootstrapfarmer.com
Tools
● Drill and drill bits
● Metal saw
● Single Jack (3 pound hammer)
Page 31
www.bootstrapfarmer.com

Advertisement

Table of Contents
loading

Table of Contents