Toshiba MCY-MHP0806HT8-C Series Service Manual page 170

Table of Contents

Advertisement

Step Component
15
Fan guard
1. Detachment
1) Remove the discharge cabinets. [Step.2]
CAUTION
For scratch protection, work on a carton box,
cloth, or the like.
2) Remove the screws from the discharge cabinet
and fan guard knob. (M4×10, 2) (Fig. 15-1)
3) Remove the hooks (8 positions) of the fan guard
by pushing it with a flat-head driver or the like.
(Fig. 15-2, 15-3)
4) Remove the fan guard from the discharge
cabinet.
2. Attachment
1) Insert the upper protrusion of the fan guard into
the square hole of the discharge cabinet, and
insert the hooks (8 positions).
2) Install the two screws in their original positions.
CAUTION
Confirm that all the hooks are securely fixed to
specified positions.
16
Heat
1. Detachment
exchanger
1) Collect the refrigerant gas with the recovery
assembly
equipment.
2) Remove the screw of the inverter assembly, etc.
[Step.5]
3) Remove the screws fixing the motor base (upper)
and motor base (lower), and remove the motor
base (upper). (M4×10, 2) (Fig. 16-1)
4) Remove the screws fixing the motor base (lower),
bottom plate and motor base fixing plate (lower),
and remove the motor base (lower).
(M4×10, 4) (Fig. 16-1,16-2)
Procedure
Hooks
Flat-head driver
(Fig. 15-3)
169
Remarks
Screws (2 positions)
Discharge cabinet
Discharge cabinet
Fan guard
(For China type)
(For Europe and Turkey type)
(Fig. 15-1)
Hooks (8 positions)
(Fig. 15-2)
Motor base
Motor base
(upper)
fixing plate (upper)
Screws
(2 positions)
Motor base
Motor base
fixing plate
(lower)
(lower)
Screws
(2 positions)
Bottom plate
(Fig. 16-1)
Screws (2 positions)
Fan guard
Fan guard
Discharge cabinet
Screws (2 positions)
(Fig. 16-2)

Advertisement

Table of Contents
loading

Table of Contents