Definition Of Terms; Responsibility Of The Operator - darda C2S Product Manual

Hydraulic stone and concrete splitter
Table of Contents

Advertisement

1 Introduction
1.4
1.5
2

Definition of Terms

In this product manual, the hydraulic stone and concrete splitter is described as a
device in the following sections.

Responsibility of the Operator

The operator is required to allow work with the device only by experts who
– were sufficiently trained in accordance with the activities to be carried out.
– know the fundamental requirements for work safety and the prevention of acci-
dents and have been familiarised with the handling of the device by qualified
staff.
– have read and understood the safety and warning information in this documen-
tation.
Please regard the following instructions in the interest of all staff:
Add to this documentation the generally valid, legal and otherwise binding regu-
lations for work safety, accident prevention and environmental protection, and
inform the personnel working with the device about this!
Supplement this documentation with instructions taking into account specific
company features e.g. regarding the organisation of work, processes, personnel
deployed (including duty of supervision and notification)!
Clearly determine the responsibilities of the staff for the operating, cleaning,
maintenance, etc.!
Check at regular intervals whether the personnel bear the danger and safety in-
structions in mind during work!
Take measures to ensure the device is only operating when in safe and perfect
operating condition!
Have the device cleaned and serviced at regular intervals!
Do not let any structural changes be made (with the exception of those de-
scribed in the documentation) without written approval from the manufacturer!
Ensure that persons that were not familiarised with the residual risks of the de-
vice via the safety instructions do not enter the danger zone of the device!
The operator or construction management team is solely responsible for secur-
ing the construction site / demolition site and its surroundings.
Before beginning work, the persons responsible for the construction site / demo-
lition site must ensure that there are no dangers, particularly when cable lines
for supplying energy or dangerous materials are present.
Measures are to be taken or a suction system is to be installed in cases where
dust builds up. For short work, you can also use respiratory equipment suited
for dust.
IM Hydraulic Stone and Concrete Splitter, Version 1.0 04/2010
OM, 2 Safety Instructions

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4sC9C10sC12

Table of Contents