darda C2S Product Manual page 50

Hydraulic stone and concrete splitter
Table of Contents

Advertisement

6 Replacing Splitting Heads
6.1.2
30
Assembly of the splitting wedge and / or pressure pieces
A
1 Built-in pot
2 Pressure piece
3 Screw
4 Bolt
5 Splitting wedge
Fig. 6-1-2 - 1
Assembly of the splitting wedge / pressure pieces
If need be, insert the pressure pieces (2) by guiding them into the built-in pot (1)
and turning them 90 º (fig. A).
Spread the pressure pieces and insert the splitting wedge (5) into the built-in
pot.
Stick the bolt (4) through the screw opening into the hole of the splitting wedge
and bang it carefully through the wedge head with a mandrel and hammer.
Using the splitting wedge with a not completely inserted bolt leads to dam-
age or destruction of the splitting cylinder!
Before start-up, close the screw opening by completely tightening the
screw (3)!
Insert the plastic cap (6) into the hole on the opposite side (fig. B).
Activate the hydraulic aggregate and retract the splitting wedge completely
(operating lever in position R).
Press the rubber disc (7) into the recess of the built-in pot.
Insert the guide disc (9) with its guide pins (8) in the recess of the built-in pot so
that their surface is flush with the front of the built-in pot (fig. C)
Screw the grommet nut (fig. 6-1 - 1, pos. 3) onto the built-in pot with the sickle
spanner.
Push the rubber disc (fig. 6-1 - 1, pos. 2) over the splitting head to the front sur-
face of the grommet nut.
OM Hydraulic Stone and Concrete Splitter, Version 1.0 04/2010
B
6 Plastic cap
7 Rubber disc
8 Guide pin
9 Guide disc
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4sC9C10sC12

Table of Contents