Dimplex Optimyst CAS500P-RGB-EU Operating Instructions Manual page 7

Hide thumbs Also See for Optimyst CAS500P-RGB-EU:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
INSTALLING THE LOG FUEL BED (IF SUPPLIED)
The product is supplied with a 'metal fuel bed' fitted. If you have chosen to operate your product with a log fuel bed,
remove this metal fuel bed and retain it for future use (Fig. 12). Follow the steps below to install the log fuel bed.
1.
Gently lift the LED Log fuel bed out of its packaging. CAUTION: The fuel bed weighs 5kg. Be sure to only lift the fuel
bed by the two centre logs (Fig. 13).
2.
Place the fuel bed on top of the appliance, there are 4 plastic guides under the fuel bed to help locate it (Fig.7).
Please note the fuel bed can be placed front to back or back to front on the product.
3.
Once the fuel bed is in place, remove the small loose log (Fig 14). This small log is secured with magnets and should
easily lift off the fuel bed.
4.
Locate the DC jack under the small log and connect it to the corresponding DC jack located on the product through
the hole in the fuel bed (Fig.15).
5.
Each log fuel bed is supplied with a loose non LED log. For single CAS500P-RGB-EU installations, this can be
placed on top of the fuel bed or stored away with the packaging. For CAS1000P-RGB-EU or multiple product
installations, the loose log can be placed on the join in the centre between two fuel beds (Fig 16).
MULTIPLE PRODUCT INSTALLATION (DAISY CHAINING)
POWER CONNECTIONS
Both the CAS500P-RGB-EU and CAS1000P-RGB-EU products can be installed side by side to elongate the flame
effect. When supplying power to multiple products, ensure the maximum wattage of the combined products does not
exceed the rated capacity of the MCB (Minature Circuit Breaker) in the circuit.
The water supply to multiple products should be constructed in a manifold style configuration and sized appropriately for
the number of units that are being installed so a consistent water volume and pressure is being supplied to each unit.
MULTIPLE PRODUCT INSTALLATION
Follow steps 1-4 in "Installing the Product into Surround/Enclosure" to fit the first product. It is important that the first
product is orientated so that the side of the product with the slots is left free and not connected to first end of the
installation (Fig 17).
1.
When the first product is installed and securely fixed, prepare the second product by unscrewing the joining screws
and screwing them into the opposite side of the metalwork (Fig 18). Please note, these screws should not be fully
tightened and 5-10mm of thread should be left protruding from the edge of the product.
2.
Fit the second product beside the first product, ensuring the protruding screws of the second product engage with
slots of the first product. (Fig 19)
3.
Ensure the second product is at the correct height to match the first product and ensure it is adequately level. This
can be done by adjusting the adjustable feet with a flat head screwdriver. (Fig 5) The levelness of the product can
be verified by checking the on-board level (Fig 6)
4.
Tighten the screws of the second product so that it joins tightly with the first product.
Additional products can be fitted to the second product by following steps 1-4 above.
MULTIPLE PRODUCT CONTROL
Each product has been supplied with its own link wire in order to form a hardwire link between multiple products. Up
to 10 product modules may be connected using the link wire for control through a single Bluetooth receiver (e.g. 10 x
CAS500 or 5 x CAS1000 or any combination up to 10 modules). Please follow the instructions below to link multiple
products together.
1.
Identify the 'master' product in the installation. It should the product on the left hand side of the installation.
2.
Connect the Bluetooth receiver to this product (Fig 20A, 21A). This will be the only Bluetooth receiver in the
installation and will control the rest of the products in the installation. In an installation of both CAS500P-RGB-EU &
CAS1000P-RGB-EU products, the Bluetooth receiver (Fig 9) should be connected to the 'master' product.
3.
Plug the daisy chain link wire into the connector on the right hand side of the first/'master' module (Fig 20B, 21B).
4.
Feed the wire through the hole in the metalwork and into the housing of the next product in the installation.
5.
Plug the daisy chain link wire into the left hand connector on the RGB strip on the following product (Fig 20C, 21C).
6.
Each product is fitted with a rotary identifier switch which must be adjuted for daisy chaining (Fig 22). The master
unit should be set at 0 (default). Subsequent units should be given a unique identifier number on each binary switch.
7.
Repeat steps 3-6 above in order to connect subsequent products in the installation.
Once set up, any command sent to the first product will be sent to all subsequent products. Flame height control and
sound level control of the master product is matched for all subsequent products. If individual flame height control is
required, this can be done by using the on board flame height controls on the product (Fig 23).
Additionally, the software of the product has been designed in such a way that when multiple products are connected
to a main switch, products can be manually switched off and when switched back on they will operate in the same state
as before they were switched off.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optimyst cas1000p-rgb-eu

Table of Contents