Samsung Max Heat DVM S2 Technical Data Book page 76

Table of Contents

Advertisement

10. Installation
Connect the ring terminal of 3 phase cable
1 Cut the power cable to an appropriate length and connect it with the solderless terminal.
2 After connecting the power cable to the terminal as seen in the illustration, fix it with cable tie.
3 Fix the housing, which has an insulator, to the terminal board.
Fixing the ground cable
• Connect the ground cable to the grounding hole inside the power supply box
Withdrawing the power cable
• Withdrawing from the front side
– Connect the power cable protection tube into the power supply box as shown picture.
– Be sure that the power supply cable is not damaged by burr on the knock-out hole.
Grounding

Advertisement

Table of Contents
loading

Table of Contents