Turn On The Calibrator; Warmup; Product Use - Fluke 5730A Operator's Manual

Multifunction calibrator
Hide thumbs Also See for 5730A:
Table of Contents

Advertisement

5730A
Operators Manual

Turn on the Calibrator

To avoid electric shock, make sure the Product is safely
grounded as described in Chapter 2.
Make sure the rear power switch is on and then push Oto turn on the 5730A
Calibrator. When the Calibrator is turned on, it takes approximately 50 seconds to
complete its power-up process.
After the power-up process, the display shows the normal operation screen:
The Calibrator is in standby mode with the internal sensing and internal guard
configured. The Calibrator can now accept entries from the front panel.

Warmup

Make sure the 5730A Calibrator is warmed up before use. The environmentally-
controlled components inside must be stable to meet or exceed the specifications in
Chapter 1. Sufficient warmup times are:

Product Use

Touchscreen navigation is used to move throughout the 5730A Calibrator user interface
(UI) and menus.
4-2
If the Calibrator has been powered off for 1 hour or more, allow at least 30 minutes
of warmup time.
If the Calibrator has been powered off for a length of time less than 1 hour, allow it to
warm up for at least twice the length of time it was turned off. For example, if it has
been powered off for 10 minutes, allow at least 20 minutes of warmup time.
XWWarning
hhp102.tif

Advertisement

Table of Contents
loading

Table of Contents