Checklists Prior To Mounting - Siemens SIMOTICS S-1FT2 Operating Instructions Manual

Synchronous motors
Hide thumbs Also See for SIMOTICS S-1FT2:
Table of Contents

Advertisement

6.2

Checklists prior to mounting

Procedure
Note
Required checks
The checklists below do not purport to be complete. It may be necessary to perform additional
checks and tests in accordance with the situation specific to the particular installation site.
• Install the motor as described in the following chapters of the operating instructions.
• Thoroughly familiarize yourself with the safety instructions and observe the checklists below
before starting any work.
Table 6-1
General checks
Are all necessary components of the configured drive available?
Are the ambient conditions in the permissible range?
Table 6-2
Is the motor free of visible damage?
Have the mounting surfaces (e.g. flange, shaft) on the customer machine and on the
motor been cleaned?
Are the mounting surfaces free of corrosion?
Do the mounting dimensions (e.g. shaft diameter, shaft length, true run) on the customer
machine meet the specification?
SIMOTICS S-1FT2 synchronous motors for SINAMICS S120
Operating Instructions, 12/2023, A5E50610821B AF
Checklist prior to installation
Section "Ambient conditions (Page 28)"
Checklist to check the mechanical system
Check
Check
Mounting
6.2 Checklists prior to mounting
 
 
 
 
 
 
OK
OK
69

Advertisement

Table of Contents
loading

Table of Contents